PDF
|
105th_Phase II ESA.pdf
|
DECP/24/2563
|
PDF
|
January 2 2024 PH North 6561 816-23001-04 FSI Rpt(v04-FINAL)
|
DECP/24/2947
|
PDF
|
6561 Pacific Hoe North 1816-23001-04(FSI-WP)v06-FINAL 2023-November-3
|
DECP/24/2948
|
PDF
|
6561 Pacific Hoe North 1816-23001-04 FSI Rpt(v04-FINAL) 2024-Jan-2
|
DECP/24/2949
|
PDF
|
2-4-2024 2441 (Lampros-SCM)v06-FINAL
|
DECP/24/2970
|
PDF
|
March 1 2024 2441(Lampros-SCM)v06-FINAL
|
DECP/24/2971
|
PDF
|
February -22+2024 Lampros SCM Outfall Performance Monitoring ECSI 2441 1355-19001-02(Lampros-SCM)v06-FINAL
|
DECP/24/2972
|
PDF
|
6561 Pacific Hoe North 1816-23001-04(FSI-WP)v06-FINAL 2023-Nov-3
|
DECP/24/2985
|
PDF
|
20240405-2441-Lampros-SW_SCE_SCM_Performance_Monitoring(EVENNW)
|
DECP/24/3193
|
PDF
|
1355-19001-02(Lampros-SCM)v05-DRAFT DEQ Edits 2023-August-28 (002)
|
DECP/24/5143
|
PDF
|
20240409_2062_MW_Aband_Report (v03-FINAL)
|
DECP/24/6161
|
PDF
|
Interim Remedial Action Measures:Used Oil Tank and Hoist Decommissioning, 12,4,2023
|
DELU/24/1386
|
PDF
|
2024-04-04_5470_Groundwater-Monitoring-Report-1Q-2024
|
DECP/24/6583
|
PDF
|
6561 Pacific Hoe North 1816-23001-04 FSI Rpt(v04-FINAL) 2024-Jan-2
|
DECP/24/7632
|
PDF
|
6561 Pacific Hoe North 1816-23001-04(FSI-WP)v06-FINAL 2023-Nov-3
|
DECP/24/7634
|
PDF
|
5257 Status of Soil Cap Placement
|
DECP/24/7833
|
PDF
|
5257 Annual Cap Inspection (2020)
|
DECP/24/7853
|
PDF
|
5257 Annual Cap Inspection (2021)
|
DECP/24/7854
|
PDF
|
5257 Annual Cap Inspection (2023)
|
DECP/24/7855
|
PDF
|
5257 RDRA Installation Progress Report
|
DECP/24/7858
|
PDF
|
5257 RDRA Update Letter
|
DECP/24/7859
|
PDF
|
2023_04_11-6148-Intrepid-Tile-Stormwater-SCE
|
DECP/24/7974
|
PDF
|
20250717-ECSI6492-WestwindApts-(2025-Annual Cap Insp)(v01)FINAL
|
DECP/25/4116
|
PDF
|
03-19-0934 November 2023 Work Plan
|
DELU/25/2727
|
PDF
|
03-19-0934 Vapor and Soil Gas Assessment (Feb 2024)
|
DELU/25/2731
|