PDF
|
2012 Tualatin Subbasin Appendix 2A Tualatin River Total Maximum Daily Loads - Total Phosphorus and Dissolved Oxygen Analysis for the Upper River Final Report
|
DETP/25/1958
|
PDF
|
2012 Tualatin Subbasin Appendix 2-B Tualatin River Total Maximum Daily Loads for Total Phosphorus 4-20-2009 Phosphorus Control Period
|
DETP/25/1959
|
PDF
|
2012 Tualatin Subbasin Appendix 3-A Changes to the 2001 Dissolved Oxygen TMDL for the Tualatin Basin
|
DETP/25/1960
|
PDF
|
2012 Tualatin Subbasin Chapter 1 Overview and Background
|
DETP/25/1961
|
PDF
|
2012 Tualatin Subbasin Chapter 2 pH and Chlorphyll a (Total Phosphorous) TMDL Amendment
|
DETP/25/1962
|
PDF
|
2012 Tualatin Subbasin Chapter 3 Amendment to 2001 Waste Load Allocations for Ammonia Under 2001 Dissolved Oxygen TMDL for the Tualatin Basin
|
DETP/25/1963
|
PDF
|
2012 Tualatin Subbasin Chapter 4 Water Quality Management Plan
|
DETP/25/1964
|
PDF
|
Executive Summary
|
DETP/25/1966
|
PDF
|
2012 Tualatin Subbasin Executive Summary
|
DETP/25/1967
|
PDF
|
2012 Tualatin Subbasin Fact Sheet Working for Clean Water in the Tualatin River Subbasin
|
DETP/25/1968
|
PDF
|
2012 Tualatin Subbasin TMDL Order Memo
|
DETP/25/1970
|