April 16, 2007        Also sent by e-mail

 

Mr. Ted McCall

McCall Oil and Chemical Corporation

5480 NW Front Avenue

Portland, Oregon 97210

 

 

RE:  Stormwater Plan Approval

McCall Oil Site

 ECSI No. 134

 

 

Dear Mr. McCall:

 

The Department of Environmental Quality (DEQ) reviewed your April 9, 2007 response to comments on the February 2, 2007 Stormwater and Catch Basin Sediment Sampling Plan (Plan) for the McCall Oil and Chemical Site. In the interest of collecting stormwater samples during this wet-weather season, the DEQ accepts your Plan as amended with your April 9, 2007 responses. The DEQ understands that you will implement the Plan this week, collecting stormwater samples in April and May, 2007. You are correct in assuming that the following evaluations should be done concurrently with stormwater and catch basin sampling: 1) potential groundwater impacts to the stormwater conveyance system, and 2) erodible bank soil migration to the Willamette River.

 

The lack of a timely response to the DEQ’s March 5, 2007 General Comment #2 concerning a site-wide stormwater drainage plan means that the adequacy of sampling points (particularly along Front Ave.) will be evaluated after implementation of the Plan. Although the DEQ has accepted your proposal to proceed in this manner, stormwater from areas of concern that are not included in the Plan may require sampling at a later date.

 

Please call me at (503) 229-5326 if you have questions.

 

 

Sincerely,

 

 

 

Tom Gainer, P.E.

Project Manager

Portland Harbor Section

 

 

 

cc:  John Edwards, Anchor Environmental

 Linda Scheffler, BES