A B C D E F G
1
BID SCHEDULE
2              
3 Blaine Street ADA Improvement Plan and City Hall Site Improvments
4 Project Description: Furnish all equipment, materials, and labor necessary to complete the construction of six (6) ADA ramps. Replacement of curb and or gutter where required. The demolition, removal, and reinstallation of four street trees. The demolition, removal, and reinstallation of sandset pavers. The demolition, removal, and reinstallation of select sidewalk concrete panels.
5
6
7              
8 ITEM
#
DESCRIPTION APPLICABLE SECTION
(not limited to)
UNIT QNTY UNIT PRICE AMOUNT
9
10              
11   GENERAL          
12 1 Mobilization
(Including performance bond, payment bond, insurance, city business permit and all other permits)
§201 LS 1 $ 400.00 $ 500.00
13 2 Site Restoration & Cleanup (Haull off all demolished material) §208 LS 1 $ 500.00 $ 500.00
14     Subtotal for GENERAL = $ 1,000
15   DEMOLITION          
16 3 Sawcut Concrete or AC §210.03.07 LF 175 $ 7.50 $ 1,312.50
17     Subtotal for DEMOLITION = $ 1,313
18   IMPROVEMENTS          
19 ADA Ramp per Detail#1, Sheet 6        
20 4 Type A Curb & Gutter §507, Std. Dwg. 501 LF 26 $ 7.50 $ 195.00
21 5 Type C Curb §507 LF 10 $ 14.00 $ 140.00
22 6 Concrete Sidewalk
(4" thick over 2" of 3/4"-0 crushed rock over compacted subgrade)
§210.03.07, §507 SF 559 $ 3.50 $ 1,956.50
23 7 Concrete Handicap Ramp
(Including forming & placing concrete, & 2' wide tactile warning surface)
Std. Dwg. 506 EA 6 $ 1,000.00 $ 6,000.00
24 9 Sandset Pavers Std. Dwg. 700 SF 70 $ 12.00 $ 840.00
25 10 Street Tree w/ Root Barrier Std. Dwg. 108 EA 4 $ 400.00 $ 1,600.00
26     Subtotal for IMPROVEMENTS = $ 10,732
27              
28  
         
29     TOTAL BID = $ 13,044
30              
31   TOTAL BID IN WRITING =          

Engineers Estimate 1

  A B C D E F G
1
BID SCHEDULE
2              
3 "ADA Sidewalk Improvements on Blaine Street" and "City Hall Frontage Improvements"
4 Project Description: Furnish all equipment, materials, and labor necessary to complete the construction of six (6) ADA ramps, curb & gutter, four (4) street trees, sand set pavers, concrete sidewalk panels, concrete panels with a waterproofing admixture, the installation of City provided bike racks and all work shown on the “ADA Sidewalk Improvements on Blaine Street” and “City Hall Frontage Improvements” plans. All costs associated with the completion of this project must be written on this BID Schedule or the costs will be considered incidental. Bidder is responsible for the demolition/ haul off of demolished materials and providing a safe corridor for vehicular and pedestrian traffic during the entire construction process.
5
6
7              
8 ITEM
#
DESCRIPTION APPLICABLE SECTION
(not limited to)
UNIT QNTY UNIT PRICE AMOUNT
9
10              
11   GENERAL          
12 1 Mobilization
(Including performance bond, payment bond, insurance, city business permit and all other permits)
§201 LS 1 $ - $ -
13 2 Site Restoration & Cleanup (Haul off all demolished material) §208 LS 1 $ - $ -
14     Subtotal for GENERAL = $ -
15   IMPROVEMENTS          
16 3 City Hall Frontage Improvements per plans LS 1 $ - $ -
17 4 ADA Sidewalk Improvements on Blaine Street per plans LS 1 $ - $ -
18     Subtotal for IMPROVEMENTS = $ -
19              
20  
         
21     TOTAL BID = $ -
22              
23   TOTAL BID IN WRITING =          

Engineers Estimate 2 (2)