| 3 | Blaine Street ADA Improvement Plan and City Hall Site Improvments | ||||||
| 4 | Project Description: Furnish all equipment, materials, and labor necessary to complete the construction of six (6) ADA ramps. Replacement of curb and or gutter where required. The demolition, removal, and reinstallation of four street trees. The demolition, removal, and reinstallation of sandset pavers. The demolition, removal, and reinstallation of select sidewalk concrete panels. | ||||||
| 5 | |||||||
| 6 | |||||||
| 7 | |||||||
| 8 |
ITEM # |
DESCRIPTION | APPLICABLE SECTION (not limited to) |
UNIT | QNTY | UNIT PRICE | AMOUNT |
| 9 | |||||||
| 10 | |||||||
| 11 | GENERAL | ||||||
| 12 | 1 | Mobilization (Including performance bond, payment bond, insurance, city business permit and all other permits) |
§201 | LS | 1 | $ 400.00 | $ 500.00 |
| 13 | 2 | Site Restoration & Cleanup (Haull off all demolished material) | §208 | LS | 1 | $ 500.00 | $ 500.00 |
| 14 | Subtotal for GENERAL = | $ 1,000 | |||||
| 15 | DEMOLITION | ||||||
| 16 | 3 | Sawcut Concrete or AC | §210.03.07 | LF | 175 | $ 7.50 | $ 1,312.50 |
| 17 | Subtotal for DEMOLITION = | $ 1,313 | |||||
| 18 | IMPROVEMENTS | ||||||
| 19 | ADA Ramp per Detail#1, Sheet 6 | ||||||
| 20 | 4 | Type A Curb & Gutter | §507, Std. Dwg. 501 | LF | 26 | $ 7.50 | $ 195.00 |
| 21 | 5 | Type C Curb | §507 | LF | 10 | $ 14.00 | $ 140.00 |
| 22 | 6 | Concrete Sidewalk (4" thick over 2" of 3/4"-0 crushed rock over compacted subgrade) |
§210.03.07, §507 | SF | 559 | $ 3.50 | $ 1,956.50 |
| 23 | 7 | Concrete Handicap Ramp (Including forming & placing concrete, & 2' wide tactile warning surface) |
Std. Dwg. 506 | EA | 6 | $ 1,000.00 | $ 6,000.00 |
| 24 | 9 | Sandset Pavers | Std. Dwg. 700 | SF | 70 | $ 12.00 | $ 840.00 |
| 25 | 10 | Street Tree w/ Root Barrier | Std. Dwg. 108 | EA | 4 | $ 400.00 | $ 1,600.00 |
| 26 | Subtotal for IMPROVEMENTS = | $ 10,732 | |||||
| 27 | |||||||
| 28 |
|
||||||
| 29 | TOTAL BID = | $ 13,044 | |||||
| 30 | |||||||
| 31 | TOTAL BID IN WRITING = | ||||||
| A | B | C | D | E | F | G | |
|---|---|---|---|---|---|---|---|
| 1 |
|
||||||
| 2 | |||||||
| 3 | "ADA Sidewalk Improvements on Blaine Street" and "City Hall Frontage Improvements" | ||||||
| 4 | Project Description: Furnish all equipment, materials, and labor necessary to complete the construction of six (6) ADA ramps, curb & gutter, four (4) street trees, sand set pavers, concrete sidewalk panels, concrete panels with a waterproofing admixture, the installation of City provided bike racks and all work shown on the “ADA Sidewalk Improvements on Blaine Street” and “City Hall Frontage Improvements” plans. All costs associated with the completion of this project must be written on this BID Schedule or the costs will be considered incidental. Bidder is responsible for the demolition/ haul off of demolished materials and providing a safe corridor for vehicular and pedestrian traffic during the entire construction process. | ||||||
| 5 | |||||||
| 6 | |||||||
| 7 | |||||||
| 8 |
ITEM # |
DESCRIPTION | APPLICABLE SECTION (not limited to) |
UNIT | QNTY | UNIT PRICE | AMOUNT |
| 9 | |||||||
| 10 | |||||||
| 11 | GENERAL | ||||||
| 12 | 1 | Mobilization (Including performance bond, payment bond, insurance, city business permit and all other permits) |
§201 | LS | 1 | $ - | $ - |
| 13 | 2 | Site Restoration & Cleanup (Haul off all demolished material) | §208 | LS | 1 | $ - | $ - |
| 14 | Subtotal for GENERAL = | $ - | |||||
| 15 | IMPROVEMENTS | ||||||
| 16 | 3 | City Hall Frontage Improvements | per plans | LS | 1 | $ - | $ - |
| 17 | 4 | ADA Sidewalk Improvements on Blaine Street | per plans | LS | 1 | $ - | $ - |
| 18 | Subtotal for IMPROVEMENTS = | $ - | |||||
| 19 | |||||||
| 20 |
|
||||||
| 21 | TOTAL BID = | $ - | |||||