Mark,

Please proceed with the sampling as proposed in your April 8, 2025 work plan.

Thanks

Jim

From: Mark Havighorst <mhavighorst@geoengineers.com>

Sent: Tuesday, April 8, 2025 5:19 PM

To: ORR Jim * DEQ <Jim.ORR@deq.oregon.gov>

Cc: LACEY David J * DEQ <David.J.LACEY@deq.oregon.gov>; ROMERO Mike * DEQ <Mike.ROMERO@deq.oregon.gov>; DeMaria, Eva <DeMaria.Eva@epa.gov>; Laura Hanna EPA (hanna.laura@epa.gov) <hanna.laura@epa.gov>; Mark.Bartee <Mark.Bartee@zenithterminals.com>; Hendrix, JT <JT.Hendrix@zenithterminals.com>; Laura Hanna EPA (hanna.laura@epa.gov) <hanna.laura@epa.gov>

Subject: RE: DEQ Request Analytical Screening SCE Work Plan for Zenith ECSI 1281

 

Some people who received this message don't often get email from mhavighorst@geoengineers.com. Learn why this is important

 

 
 

Jim,

The work plan has been revised to address your comments. Table 2 has been added to the work plan to summarize the analytical methods, MDLs, and cleanup levels for Portland Harbor.

The revised work plan is available for downloading at the link below. Please let me know if you have any questions. Thanks.

ShareFile Attachments

 

Expires October 8, 2025

 

 

 

Zenith Terminal FSCE Work Plan_20250408.pdf

 

32.4 MB

 

 

Download Attachments

 

 

 
 
 

Mark Havighorst, P.E.

Associate Environmental Engineer | GeoEngineers, Inc.

Telephone: 503.460.7146

Email: mhavighorst@geoengineers.com

 

5820 S Kelly Ave Suite B

Portland, OR 97239

www.geoengineers.com

From: ORR Jim * DEQ <Jim.ORR@deq.oregon.gov>

Sent: Thursday, March 27, 2025 11:06 AM

To: Mark Havighorst <mhavighorst@geoengineers.com>

Cc: LACEY David J * DEQ <David.J.LACEY@deq.oregon.gov>; ROMERO Mike * DEQ <Mike.ROMERO@deq.oregon.gov>; DeMaria, Eva <DeMaria.Eva@epa.gov>; Laura Hanna EPA (hanna.laura@epa.gov) <hanna.laura@epa.gov>; Mark.Bartee <Mark.Bartee@zenithterminals.com>; Hendrix, JT <JT.Hendrix@zenithterminals.com>; Laura Hanna EPA (hanna.laura@epa.gov) <hanna.laura@epa.gov>; ORR Jim * DEQ <Jim.ORR@deq.oregon.gov>

Subject: DEQ Request Analytical Screening SCE Work Plan for Zenith ECSI 1281

CAUTION! THIS IS AN EXTERNAL EMAIL

If you suspect this is a phishing email, click the Phish Alert Report button.

Mark,

Please report all groundwater sample COIs, analytical methods, detection limits, and screening levels.

We had previously requested C10-C12 as COIs.

This information should be incorporated into the work plan and resubmitted.

Thanks

From: Mark Havighorst <mhavighorst@geoengineers.com>

Sent: Monday, March 24, 2025 1:17 PM

To: ORR Jim * DEQ <Jim.ORR@deq.oregon.gov>

Cc: LACEY David J * DEQ <David.J.LACEY@deq.oregon.gov>; ROMERO Mike * DEQ <Mike.ROMERO@deq.oregon.gov>; DeMaria, Eva <DeMaria.Eva@epa.gov>; Laura Hanna EPA (hanna.laura@epa.gov) <hanna.laura@epa.gov>; Mark.Bartee <Mark.Bartee@zenithterminals.com>; Hendrix, JT <JT.Hendrix@zenithterminals.com>

Subject: RE: DEQ Request for a SCE Work Plan for Zenith ECSI 1281

Jim,

The FSCE Work Plan has been revised to address DEQ’s and EPA’s comments. The final version of the work plan is available for downloading at the link below.

ShareFile Attachments

 

Expires September 19, 2025

 

 

 

Zenith Terminal FSCE Work Plan_Final.pdf

 

34 MB

 

 

Download Attachments

 

Julie Mayfield uses ShareFile to share documents securely.

 

 
 
 

Zenith plans to initiate the DEQ- and EPA-requested groundwater sampling in the second quarter of 2025.

In the interim, please let me know if you have any questions.

 

Thank you

Mark Havighorst, P.E.

Associate Environmental Engineer | GeoEngineers, Inc.

Telephone: 503.460.7146

Email: mhavighorst@geoengineers.com

 

5820 S Kelly Ave Suite B

Portland, OR 97239

www.geoengineers.com

From: ORR Jim * DEQ <Jim.ORR@deq.oregon.gov>

Sent: Friday, February 28, 2025 1:03 PM

To: Caldwell, Shannon <Shannon.Caldwell@zenithterminals.com>

Cc: LACEY David J * DEQ <David.J.LACEY@deq.oregon.gov>; ROMERO Mike * DEQ <Mike.ROMERO@deq.oregon.gov>; DeMaria, Eva <DeMaria.Eva@epa.gov>; Laura Hanna EPA (hanna.laura@epa.gov) <hanna.laura@epa.gov>; Mark Havighorst <mhavighorst@geoengineers.com>; ORR Jim * DEQ <Jim.ORR@deq.oregon.gov>

Subject: DEQ Request for a SCE Work Plan for Zenith ECSI 1281

CAUTION! THIS IS AN EXTERNAL EMAIL

If you suspect this is a phishing email, click the Phish Alert Report button.

Feel free to let me know if you have questions.

Thank You kindly

Jim Orr R.G.

DEQ Northwest Region

700 NE Multnomah St., Suite 600

Portland, Oregon 97232

503-961-2647 Cell Phone

jim.orr@deq.oregon.gov

Someday, I hope to be the person that my dogs believe I am

image

image

Useful DEQ Links:

State of Oregon: Department of Environmental Quality

Oregon DEQ: Land Quality - Environmental Cleanup Site Information (ECSI) Database

Confidentiality: This message is confidential and intended solely for use of the individual or entity to whom it is addressed. If you are not the person for whom this message is intended, please delete it and notify me immediately, and please do not copy or send this message to anyone else.

Confidentiality: This message is confidential and intended solely for use of the individual or entity to whom it is addressed. If you are not the person for whom this message is intended, please delete it and notify me immediately, and please do not copy or send this message to anyone else.