Department of Environmental Quality
Northwest Region
700 NE Multnomah Street, Suite 600
Tina Kotek, Governor Portland, OR 97232
(503) 229-5263
FAX (503) 229-6945
TTY 711
August 13, 2024 via electronic delivery
Lynn Green
EVRENNORTHWEST
40 SE 24th Avenue
Portland, Oregon 97214
Subject: DEQ Request for a Feasibility Study
Irwin Hodson Site
Subject: DEQ Request for a Feasibility Study
Portland, Oregon
ECSI # 6399
Lynn Green,
The Oregon Department of Environmental Quality (DEQ) has prepared this letter in response to the August 6, 2024 email from Evren-NW on behalf of Irwin Hodson. Irwin Hodson is currently conducting cleanup work under a voluntary cleanup agreement.
DEQ is concerned with the chronic and acute potential vapor exposure of your tenants of the Irwin Hodson warehouse. The site conditions have not been adequately evaluated to determine current and potential future risks. The evaluation of site risk and a hot spot removal action may require an assessment of data gaps and will require a Feasibility Study (FS)
The email states that Irwin Hodson feels that DEQ’s requirements to achieve site closure are uncertain. Based on the information in the email, the uncertainty appears to be related to the applicability of revised risk-based concentrations (RBCs) associated with sub-slab vapor and s. In addition, the email requests DEQ confirmation that DEQ will issue a no further action letter if various conditions are met and states that Irwin Hodson is unwilling to move forward consistent with DEQ’s direction until DEQ agrees to the site closure requirements.
Before DEQ can review and approve remedy performance requirements, it will need to select a remedial action. The FS, which DEQ has identified as the next step for the Irwin Hodson site, will inform the remedial action selection. If the selected removal action has contaminants at concentrations above acceptable risk levels but below hot spot levels. A no further action determination will be conditional based on the long-term effectiveness of engineering and/or institutional controls.
DEQ requests that the FS be performed and reported to DEQ within 30 days of this letter. If Irwin Hodson is unwilling to perform an FS, DEQ will consider a more directed process.
Sincerely,
Jim Orr
Jim Orr
NWR DEQ Project Manager
Ec:
Amanda Wozab, DEQ
Thomas Wesley, DEQ
Todd Vaneck, DEQ
Erin McDonnel, DEQ
Mike Poulsen, DEQ
Gary Vrooman, DOJ
Heather Brown, IHCO
Scott Jerger, Field Jerger
ORMS File # 6399