I can provide the lab results I have received so far from Elder Demo, see attached.

Thanks,

Ryan Webb, P.E.

Engineering and Planning Manager

The Confederated Tribes of Grand Ronde

Direct: (503) 879-2404

Cell: (503) 437-4544

Email: Ryan.Webb@grandronde.org

Website: www.grandronde.org

The documents accompanying or information included in this electronic transmission contain confidential information belonging to the sender that is legally privileged. This information is intended only for the use of the individual or entity named above. The authorized recipient of this information is prohibited from disclosing this information to any other party and is required to destroy the information after its stated need has been fulfilled, unless otherwise required by state law. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution, or action taken in reliance on the contents of these documents is strictly prohibited. If you have received this email in error, please notify the sender immediately to arrange for return of these documents. Hayu Masi (Many Thanks).

From: PUGH Mark * DEQ <Mark.PUGH@deq.oregon.gov>

Sent: Thursday, February 13, 2025 8:50 AM

To: Krysta Krippaehne-Stein <kstein@maulfoster.com>

Cc: Kathy Lombardi <klombardi@maulfoster.com>; Ryan Webb <Ryan.Webb@grandronde.org>

Subject: RE: Blue Heron Demo Update

**

 

This message has originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email.

 

**

Krysta, thank you for this update. Based on MFA’s and their subs’ past experience under multiple DEQ approved plans for other building demos on the property, including prior demolition of a burnt structure, I am comfortable to move forward without an approved RAP. Is it possible to get a general RAP outline with general elements of the work before work begins? Also, can you provide lab results as they become available?

From: Krysta Krippaehne-Stein <kstein@maulfoster.com>

Sent: Thursday, February 13, 2025 8:30 AM

To: PUGH Mark * DEQ <Mark.PUGH@deq.oregon.gov>

Cc: Kathy Lombardi <klombardi@maulfoster.com>; Ryan Webb <ryan.webb@grandronde.org>

Subject: Blue Heron Demo Update

Hi Mark,

We’d like to provide an update on the status of work for the next phase of demolition at the former Blue Heron Mill site.

We have completed all required City permitting applications. The City has provided email approval of the demolition of the fire-impacted structures.

Terracon completed asbestos and TCLP sampling of the fire debris last Friday. Asbestos results were nearly all ND (only one sample with <1% chrysotile). TCLP results are still pending.

We are turning our focus to preparation of the Removal Action Plans (RAPs) for DEQ review. We have broken the structures into the four complexes as outlined in the attached Figure 1 (the Digester Complex, the Paper Machine Complex, Paper Machine No. 4, and the Deink Complex). We will prepare one RAP for each complex, first prioritizing the RAP for the fire-impacted Paper Machine Complex.

Given the fire-related safety concerns, The Confederated Tribes of the Grand Ronde would like to begin demolition of the Paper Machine Complex next week, pending final City sign off. We recognize this expedited timeline to alleviate safety concerns associated with the fire does not allow for our typical RAP preparation/DEQ review/approval process for the Paper Machine Complex. We would like to request your approval to proceed with commencement of the Paper Machine Complex demolition prior to finalization of the RAP. We anticipate we will complete our draft Paper Machine Complex RAP by the end of next week. Is this approach acceptable to the DEQ?

Please let us know if you have any questions.

Thank you,

KRYSTA KRIPPAEHNE-STEIN | MAUL FOSTER & ALONGI, INC.

Project Engineer

pronouns: she/her

d. 360 947 2218 | c. 503 828 8961

image

 

3140 NE Broadway, Portland, OR 97232

www.maulfoster.com