From: SCHERZINGER Bruce * DEQ

Sent: Tue Apr 16 16:15:57 2024

To: KINGERY Sarah * DEQ

Cc: SCHERZINGER Bruce * DEQ

Subject: RE: Project check-in

Importance: Normal

Attachments: image001.png;

 

Sarah,

In looking at the TPH-Gx for ARCO 4077, the 4th quarter was 522/520 which is within sample error, although technically it exceeds I would consider it close enough.

Allen Street, after Bryn and you draft the SOW you might ask Don for his thoughts too, before sending it to me.

Bruce

From: KINGERY Sarah * DEQ <Sarah.KINGERY@deq.oregon.gov>

Sent: Tuesday, April 16, 2024 2:50 PM

To: SCHERZINGER Bruce * DEQ <Bruce.SCHERZINGER@deq.oregon.gov>

Subject: Project check-in

Here’s a list of my projects for which you are lead worker and an update on status:

Unocal Bulk Plant 20-86-4002: We received an email last week from the consultant indicating that they completed water sampling of MW-12 (well located on commercial property with residential on the other side of the street). They will be submitting a memorandum with results and a workplan to include a soil gas investigation. Closure delayed until next year most likely.

PacPride-Newberg 36-22-0366: Sent draft EES to consultant/RP. Two weeks ago, the consultant asked for a word document format so that the RP could make edits. I suggested that they just make comments on the PDF. I haven’t heard from them since.

Bilsland Mobile 27-84-4009: No movement-still waiting for the consultant to get back to me regarding my request for water sampling.

Diedrich Building 24-23-0130: NFA in manager review, FIR workflow started. Expect to close May (no bean)

TimeOut Food Stop 22-05-0885: Waiting on results from most recent soil gas sampling. I should circle back to them.

ODOT Minto, ROW Sweet Home, Santiam Junction (closed or waiting on payment). My part complete.

OSU Farm Service: Waiting on final payment. My part complete.

OSU Graf Hall : Waiting on consultant to do groundwater and soil gas sampling-On hold until summer.

Arco 4407 24-01-4010: I sent you an email about this one (see attached). I would like to see what you think about this.

Allen Street Soil Gas investigation: working with Bryn on the SOW. After I get that built out you should probably verify that it’s correct. Also, what about a team as I had asked about?

7-eleven24230 22-08-0575: I need to look at this one more time and create an outline of next steps then we can discuss.

Schedule a meeting for later in the week if you feel it is still needed.

image

 

Sarah Kingery

Environmental Cleanup Project Manager

Oregon Department of Environmental Quality

Western Region

165 E. 7th Avenue, Suite 100

Eugene, OR 97401

P: (541 )321-3687 | Sarah.Kingery@deq.oregon.gov

Pronouns: She/Her/Hers