A B C D E F
1 #VALUE!          
2 Community Climate Investment (CCI) Credit Contribution Amount Considerations
3 Note: Amount stays same until March 2027 to allow time for CCI entity approval process
4 Note: Amount includes implementation, administration, and oversight of CCI program

Introduction

  A B C D E F
1 Reference points for proposed CCI contribution amount   CCI contribution amount at program invalidation Proposed 2025 CCI contribution amount ($2024)    
2     $ 123 $ 129    
4 Project Examples Estimated Price/Ton MTCO2E Source Link Note  
5 Climate Pollution Reduction Grant (CPRG) Application - OR - multiple projects including (transportation electrification, building decarbonization, and waste) $ 159 CPRG https://www.oregon.gov/deq/ghgp/pages/climate-pollution-reduction-planning-grant.aspx Project types: Transportation, buildings, waste and materials These numbers include all costs, engagement, adminstration, training, etc. For 12 measures.
6 CPRG Application - UT - multiple projects $ 175 CPRG https://lf-public.deq.utah.gov/WebLink/DocView.aspx?id=385857&repo=Public&searchid=ab6396c4-dc14-46fd-9dca-def9912f4a14 Project types: Transportation, buildings, industry These numbers include all costs, engagement, adminstration, training, etc. For 9 measures.
7 CCI Entity Application - multiple projects $ 145 CCI Entity Application, 2023 700 NE Multnomah Blvd, Portland, OR 97203 Project types: Transportation, buildings, solar This is the average of 23 project estimates, supported by community engagement efforts.
8 Sustained Fixed Route Transit - WA CCA $ 150 CCA Proceeds Report, 2023 https://apps.ecology.wa.gov/publications/documents/2314020.pdf Project type: transportation  
9 Sustained Transporation Systems - WA CCA $ 126 CCA Proceeds Report, 2023 https://apps.ecology.wa.gov/publications/documents/2314020.pdf Project type: transportation  
10 Sustained Shuttles Program - WA $ 82 CCA Proceeds Report, 2023 https://apps.ecology.wa.gov/publications/documents/2314020.pdf Project type: transportation  
12 Project type from CCI Application Cost        
13 1 head ductless heat pump $147        
14 2 head ductless heat pump $120        
15 New and Existing heat pump controls $31        
16 Smart Thermostat $107        
17 Attic Insulation $182        
18 Weatherization & EE in gas heated home $402        
19 Weatherization in gas heated home $166        
20 Ductless Heat Pump (elec home) $156        
21 Duct Sealing $201        
22 Solar- Res - Income Qualified $256        
23 Solar - Small Commercial $188        
24 Solar - Large Commercial $134        
25 Solar - EJ Focus $144        
26 Solar - Small Community $128        
27 Solar - Large Community $86        
28 Micro Hydro in pipe water flow $70        
29 Ductless heat pump - multifamily $187        
30 Packaged terminal heat pumps $148        
31 Efficient Clothes Washer $100        
32 Refrigeration - ETO match $72        
33 Ceiling insulation - ETO match $38        
34 Lighting - ETO match $68        
35 Fleet electrification $195        
36 AVERAGE all project examples in CCI entity application (reflected above) 145        
39 Measure from Oregon's Climate Pollution Reduction Grant implementation Application Cumulative GHG emissions reduction 2025-2030 (MTCO2E) Cumulative GHG emissions reduction 2025-2050 (MTCO2E) 5-year implementation cost ($)   Cost per ton GHG reduced 2025-2030 ($)
40 Transportation          
41 Charge ahead 190,000 1,030,000 $30,996,336.00   $163.14
42 Light duty chargers 36,958 824,627 $10,900,601.00   $294.95
43 MHD Rebate 71,484 363,828 $14,843,772.00   $207.65
44 MHD grant 19,106 81,092 $5,989,342.00   $313.48
45 MHD chargers 3,813 113,405 $3,020,390.00   $792.13
46 Sector total 321,361 2,412,952 $65,750,441.00   $204.60
47 Resdiential and Commercial Bldgs          
48 New Residential Construction 116,774 556,340 $21,290,504.00   $203.00
49 Building Performance Standard 100,322 221,126 $12,092,375.00   $121.00
50 Heat Pump Program 83,225 368,655 $25,256,830.00   $303.00
51 Residential Weatherization 32,515 132,850 $8,055,589.00   $288.00
52 Sector Total 332,836 1,278,971 66,695,298.00   $200.38
53 Materials and Waste          
54 Building reuse and space-efficient housing 70,862 343,487 $25,585,015.00   $360.00
55 Food waste infrastructure 241,500 1,419,561 $28,867,937.00   $119.00
56 Landfill gas controls 275,222 1,100,693 $6,611,235.00   $24.00
57 Sector total 587,584 2,863,741 $61,064,187.00   $103.92
58 DEQ CPRG Administration     $3,671,870.00    
59 Total- All Measures 1,241,781 6,555,664 $197,181,796.00   $158.79

cci contribution