Draft analysis of invoices submitted with 7/3/2014 request for
reimbursement |
|
|
|
|
|
|
|
|
|
| 4 |
Invoice Date |
Invoice ID# |
Vendor |
Amount |
|
|
Work Description |
Amount for review of DEQ-funded work |
Amount not related to this site |
Net Amount |
If sampling done, did DEQ get the data? |
In Bruce's 9/22/2014 reimbursement offer |
Progress counteroffer 10/15/2014 |
DEQ counteroffer? |
if reimbursing all lab analysis |
if reimbursing air lab analysis |
| 5 |
1/23/2003 - Property owner submits Environmental Response Application |
|
|
|
|
|
| 6 |
1/1/2004 |
505 |
Tim O'Gara |
$1,200 |
|
|
collect soil and groundwater samples for analysis. Deliver to
lab, evaluate data, write report. |
|
|
$1,200 |
Y |
|
|
|
|
|
| 7 |
12/4/2006 |
810 |
Tim O'Gara |
$1,890 |
|
|
set up driller to take samples inside building. Accompany driller,
take samples, write report. |
|
|
$1,890 |
Y |
|
|
|
|
|
| 8 |
2/16/2007 |
19853-1 |
PBS |
$1,451.25 |
|
|
collect / analyze samples (?) Includes lab analysis. |
|
|
$1,451 |
? |
|
$1,451 |
|
|
|
| 9 |
5/15/2007 - Property owner given credit against payment of dry
cleaner program deductible based on prior work, per email from
Dick DeZeeuw. |
|
|
|
|
|
| 10 |
June 2007 - DEQ site prep work and utility locates |
|
|
|
|
|
| 11 |
6/28/2007 |
876 |
Tim O'Gara |
$200 |
|
|
Site visit with Hart Crowser |
$200 |
|
$0 |
N/A |
|
|
|
|
|
| 12 |
Oct / Nov 2007 - DEQ IRM soil removal |
|
|
|
|
|
| 13 |
11/6/2007 |
918 |
Tim O'Gara |
$1,600 |
|
|
Oversight on cleanup performed by Hart Crowser |
$1,600 |
|
$0 |
N/A |
|
|
|
|
|
| 14 |
2/28/2008 |
954 |
Tim O'Gara |
$720 |
|
|
Discussion and comments on DEQ letter, inspection of gas station
site at same strip mall as Progress Cleaners. |
$640 |
$80 |
$0 |
N/A |
|
|
|
|
|
| 15 |
4/18/2008 |
13758 |
Bob Carlson Inc |
$320 |
|
|
Remove old vent flashing. Fill in the hole with plywood and install
new roofing over it. |
|
? |
$320 |
N/A |
|
$320 |
no |
|
|
| 16 |
4/24/2008 |
19853-2 |
PBS |
$2,476.96 |
|
|
collect and analyze air samples, write report? Includes lab analysis. |
|
|
$2,477 |
Y |
|
$2,477 |
$2,477 |
|
|
| 17 |
5/3/2008 |
977 |
Tim O'Gara |
$640 |
|
|
Review PBS report on air sampling. Site visit with DEQ |
$120 |
|
$520 |
N/A |
|
|
|
|
|
| 18 |
6/28/2008 |
1004 |
Tim O'Gara |
$320 |
|
|
Review DEQ cleanup report, on-site meeting with DEQ |
$320 |
|
$0 |
N/A |
|
|
|
|
|
| 19 |
9/30/2008 |
34801330 |
TestAmerica |
$825 |
|
|
3 air samples |
- |
|
$825 |
Y |
$825 |
$825 |
$825 |
$825 |
$825 |
| 20 |
10/1/2008 |
1036 |
Tim O'Gara |
$1,063.19 |
|
|
Collect air samples, write report |
- |
|
$1,063 |
|
$1,063 |
$1,063 |
|
|
| 21 |
12/17/2008 |
1050 |
Tim O'Gara |
$1,020.21 |
|
|
collect air samples |
- |
|
$1,020 |
N (?) |
|
$1,020 |
$1,020 |
|
|
| 22 |
1/16/2009 |
1056 |
Tim O'Gara |
$640 |
|
|
prepare report of air sampling data |
- |
|
$640 |
N/A |
|
|
|
|
|
| 23 |
7/10/2009 |
22946 |
Specialty Analytical |
$800 |
|
|
4 aqueous VOC samples |
- |
|
$800 |
Y |
|
|
|
$800 |
|
| 24 |
7/13/2009 |
34901731 |
TestAmerica |
$825 |
|
|
3 air samples, collected ~6/29/09 |
|
|
$825 |
Y |
$825 |
$825 |
$825 |
$825 |
$825 |
| 25 |
7/13/2009 |
1094 |
Tim O'Gara |
$1,147.50 |
|
|
collect air and water samples, write report |
- |
|
$1,148 |
|
$1,148 |
$1,148 |
|
|
| 26 |
8/13/2009 |
1107 |
Tim O'Gara |
$170 |
|
|
conference call and preparation |
- |
|
$170 |
N/A |
|
|
|
|
|
| 27 |
11/10/2009 |
1136 |
Tim O'Gara |
$1,329.21 |
|
|
Collect air samples, write report |
- |
|
$1,329 |
Y |
|
$1,329 |
$1,329 |
|
|
| 28 |
2/18/2010 |
34000383 |
TestAmerica |
$875.00 |
|
|
3 air samples |
- |
|
$875 |
Y |
$875 |
$875 |
$875 |
$875 |
$875 |
| 29 |
2/18/2010 |
1171 |
Tim O'Gara |
$1,011.92 |
|
|
Collect samples, write report |
- |
|
$1,012 |
|
$1,012 |
$1,012 |
|
|
| 30 |
4/30/2010 |
34001031 |
TestAmerica |
$1,075.00 |
|
|
4 air samples |
- |
|
$1,075 |
Y |
$1,075 |
$1,075 |
$1,075 |
$1,075 |
$1,075 |
| 31 |
4/30/2010 |
1187 |
Tim O'Gara |
$785.46 |
|
|
Collect air samples, write report |
- |
|
$785 |
|
$785 |
$785 |
|
|
| 32 |
9/27/2010 |
1239 |
Tim O'Gara |
$2,830 |
|
|
collect air and water samples, write report. Includes lab analysis |
- |
|
$2,830 |
Y |
$2,830 |
$2,830 |
$2,830 |
$1,580 |
$880 |
| 33 |
12/20/2010 |
1266 |
Tim O'Gara |
$200 |
|
|
misc consulting. Invoice is for $400 but letter requests reimbursement
of $200. No details provided. |
? |
? |
$200 |
N/A |
|
|
|
|
|
| 34 |
5/18/2011 |
1304 |
Tim O'Gara |
$2,852.34 |
|
|
collect air and water samples, write report. Includes lab analysis |
- |
|
$2,852 |
Y |
$2,852 |
$2,852 |
$2,852 |
$1,496 |
$880 |
| 35 |
12/27/2011 |
1363 |
Tim O'Gara |
$200 |
|
|
misc consulting |
? |
? |
$200 |
N/A |
|
|
|
|
|
| 36 |
5/22/2012 |
1405 |
Tim O'Gara |
$1,679.85 |
|
|
Collect air samples inside Progress Credit Union (?), write report |
|
$1,680 |
$0 |
N |
|
|
|
|
|
| 37 |
2/13/2013 |
1483 |
Tim O'Gara |
$550 |
|
|
site visit with structural person, conference call with geotech,
get bid info |
? |
|
$550 |
N/A |
|
|
|
|
|
| 38 |
4/1/2013 |
1492 |
Tim O'Gara |
$2,370 |
|
|
Collect soil samples, write report. Review NGI soils report. |
? |
? |
$2,370 |
N (?) |
|
|
|
|
|
| 39 |
7/11/2013 |
1507 |
Tim O'Gara |
$2,200 |
|
|
soil sampling with geotech company, review geotech report, solicit
bids for slab overlay work, meet onsite to get overlay bid, conference
call and writeup for DEQ, finalize letter to DEQ for proposed
slab install. Some work appears to be double-billed from invoice
#1492. |
? |
|
$2,200 |
N (?) |
|
|
|
|
|
| 40 |
8/14/2013 - DEQ on-site meeting with Hart Crowser and property
owner representative (Tim O'Gara) to plan vapor barrier & floor
slab installation |
|
|
|
|
|
| 41 |
9/16/2013 |
1518 |
Tim O'Gara |
$800 |
|
|
meet DEQ on site, comment on DEQ letter |
$800 |
|
$0 |
N/A |
|
$800 |
no |
|
|
| 42 |
March 2014 - DEQ-funded installation of vapor barrier & floor
slab |
|
|
|
|
|
| 43 |
4/21/2014 - Post-installation ambient air sampling #1 (subslab
fan off, HVAC off) |
|
|
|
|
|
| 44 |
5/21/2014 - Post-installation ambient air sampling #2 (subslab
fan off, HVAC off) |
|
|
|
|
|
| 45 |
7/7/2014 - Post-installation ambient air sampling #3 (subslab
fan on, HVAC on) |
|
|
|
|
|
| 47 |
total reimbursement requested |
$36,067.89 |
|
|
|
$3,680 |
$1,760 |
$30,628 |
|
$9,282.34 |
$20,688.04 |
$18,116.79 |
$7,476.00 |
$5,360.00 |
| 48 |
|
|
|
|
|
|
|
|
|
$25,628 |
subtract $5k deductible |
|
$2,830 |
no double-counting |
|
|
| 49 |
DRAFT only |
|
|
|
|
|
|
|
$12,814 |
|
|
$23,518.04 |
$13,587.59 |
|
|