| C | D | E | F | G | H | I | J | M | N | O | P | Q | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | City of Molalla Administrative Fees | RESO # | |||||||||||
| 3 | Public Works | ||||||||||||
| 5 | Overnight parking | $5.00/night | $25.00/week | $100.00/mo. | $1000/yr | RES 2013-17 | |||||||
| 7 | Molalla Water, Sewer, Street, Storm, & Parks SDC’s | ||||||||||||
| 8 | NOTE: All SDC's subject to yearly inflation index. Check with Public Works Director for current fee values. | ||||||||||||
| 9 | Water | Sewer | |||||||||||
| 10 | Meter Factor | SDC | SDC | ||||||||||
| 11 | ¾” Meter | 1 | $ 3,818 | $ 4,794 | RES 2016-21 | ||||||||
| 12 | 1” Meter | 1.67 | $ 6,364 | $ 7,991 | RES 2016-21 | ||||||||
| 13 | 1.5” Meter | 3.33 | $ 12,728 | $ 15,981 | RES 2016-21 | ||||||||
| 14 | 2” Meter | 5.33 | $ 20,364 | $ 25,569 | RES 2016-21 | ||||||||
| 15 | 3” Meter | 10.67 | $ 40,725 | $ 51,137 | RES 2016-21 | ||||||||
| 16 | 4” Meter | 16.67 | $ 63,632 | $ 79,901 | RES 2016-21 | ||||||||
| 18 | Street SDC | $ 4,000 | RES 2016-21 | ||||||||||
| 19 | Storm SDC | $ 891 | RES 2016-21 | ||||||||||
| 20 | Park SDC | $ 7,368 | RES 2016-21 | ||||||||||
| 22 | Typical Single Family Dwelling Charges with ¾” Meter | Fee | Unit | ||||||||||
| 23 | Water Hook Up Fee | $600.00 | RES 2014-03 | ||||||||||
| 24 | Sewer Hook Up Fee | $600.00 | RES 2014-03 | ||||||||||
| 25 | Water SDC | $ 3,818 | RES 2016-21 | ||||||||||
| 26 | Sewer SDC | $ 4,794 | RES 2016-21 | ||||||||||
| 27 | Street SDC | $ 4,000 | RES 2016-21 | ||||||||||
| 28 | Storm SDC | $ 891 | RES 2016-21 | ||||||||||
| 29 | Park SDC | $ 7,368 | RES 2016-21 | ||||||||||
| 30 | Development Fee | $25.00 | RES 2014-03 | ||||||||||
| 31 | Total | $22,096.44 | RES 2014-03 | ||||||||||
| 33 | Water Base | ||||||||||||
| 34 | NOTE: All rates subject to yearly inflationary index on July 01 based on Portland-Salem (CPI-U). | Base | Use | ||||||||||
| 35 | INSIDE CITY | $ 11.13 | $ 12.80 | $ 2.44 | $ 2.81 | ||||||||
| 36 | Water - 3/4" Meter | $12.80 | RES 2016-08 | 15% increase on May 25, 2016 | |||||||||
| 37 | Water - 1" Meter | $21.45 | RES 2016-08 | ||||||||||
| 38 | Water - 1.5" Meter | $42.67 | RES 2016-08 | ||||||||||
| 39 | Water - 2" Meter | $68.57 | RES 2016-08 | ||||||||||
| 40 | Water - 3" Meter | $149.33 | RES 2016-08 | ||||||||||
| 41 | Water - 4" Meter | $255.99 | RES 2016-08 | ||||||||||
| 42 | Water - 6" Meter | $533.31 | RES 2016-08 | ||||||||||
| 43 | Water - 8" Meter | $767.97 | RES 2016-08 | ||||||||||
| 44 | Water Usage | $2.81 | per 100 CF | RES 2016-08 | |||||||||
| 46 | Bulk Water (1000 gal = 133.681 CF) | $3.76 | per 1000 gal | RES 2017-03 | 1000 gal = 133.681 CF | ||||||||
| 48 | Public Works (Cont.) | ||||||||||||
| 49 | Water Base | ||||||||||||
| 50 | NOTE: All rates subject to yearly inflationary index on July 01 based on Portland-Salem (CPI-U). | ||||||||||||
| 51 | OUTSIDE CITY | ||||||||||||
| 52 | Water - 3/4" Meter | $19.20 | RES 2016-08 | ||||||||||
| 53 | Water - 1" Meter | $32.18 | RES 2016-08 | ||||||||||
| 54 | Water - 1.5" Meter | $64.01 | RES 2016-08 | ||||||||||
| 55 | Water - 2" Meter | $102.86 | RES 2016-08 | ||||||||||
| 56 | Water - 3" Meter | $224.00 | RES 2016-08 | ||||||||||
| 57 | Water - 4" Meter | $383.99 | RES 2016-08 | ||||||||||
| 58 | Water - 6" Meter | $799.97 | RES 2016-08 | ||||||||||
| 59 | Water - 8" Meter | $1,151.96 | RES 2016-08 | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 60 | Water Usage | $4.22 | per 100 CF | RES 2016-08 | |||||||||
| 62 | Water Service Installation Fee: | *Actual Cost | RES 2016-07 | ||||||||||
| 63 | *Labor, Materials, Equipment & Admin. (3%) | ||||||||||||
| 64 | Service Shutoff Fee | $50.00 | RES 2016-07 | ||||||||||
| 65 | Door Hanger Fee | $25.00 | RES 2016-07 | ||||||||||
| 66 | Late Fee | $5.00 | RES 2007-11 | ||||||||||
| 68 | Utility Service Deposits | Residential & Commercial | $100.00 | RES 2007-11 | |||||||||
| 69 | Hydrant Customers | $700.00 | RES 2016-07 | ||||||||||
| 70 | Sewer Base | ||||||||||||
| 71 | NOTE: All rates subject to yearly inflationary index on July 01 based on Portland-Salem (CPI-U). | Base | Use | ||||||||||
| 72 | INSIDE CITY | $ 24.69 | $ 31.39 | $ 2.44 | $ 3.10 | ||||||||
| 73 | Sewer Base | $31.77 | RES 2015-13 | 27.13% increase on Nov 2015 | |||||||||
| 74 | Charges based on water usage | $3.14 | per 100 C.F. | RES 2015-13 | 1.20% | 2.10% | |||||||
| 75 | from winter months | Inc for 2015 | D | Inc for 2016 | D | ||||||||
| 76 | $ 31.39 | $ 31.77 | $ 0.38 | $ 32.44 | $ 0.67 | ||||||||
| 77 | Sewer Base | $ 3.10 | $ 3.14 | $ 0.04 | $ 3.21 | $ 0.07 | |||||||
| 78 | NOTE: All rates subject to yearly inflationary index on July 01 based on Portland-Salem (CPI-U). | ||||||||||||
| 79 | OUTSIDE CITY | ||||||||||||
| 80 | Sewer Base | $47.66 | RES 2015-13 | ||||||||||
| 81 | Charges based on water usage | $4.71 | per 100 C.F. | RES 2015-13 | |||||||||
| 82 | from winter months | ||||||||||||
| 85 | Storm Drain Fee | $3.00 | RES 2016-07 | ||||||||||
| 86 | Street Maintenance Fee | No Fee Adopted To Date | $0.00 | Not Assigned | |||||||||
| 88 | Public Works (Cont.) | ||||||||||||
| 90 | Plan Review Fee | ||||||||||||
| 91 | Engineering Design Review Fee | *1.5% but not less than $300.00 | RES 2017-03 | Based on a $15,000 project | |||||||||
| 92 | * 1.5% of the total the Engineer's Estimate of the public improvements | ||||||||||||
| 94 | Permit Fee | ||||||||||||
| 95 | Hydrant Permit Fee | $25.00 | RES 2016-07 | ||||||||||
| 96 | Blulk Water Permit Fee | $25.00 | RES 2016-07 | ||||||||||
| 97 | Right-Of-Way Permit Fee (non-franchise) | $125.00 | RES 2016-07 | ||||||||||
| 98 | Right-Of-Way Permit Fee (non-franchise) - with Street Cut | $150.00 | ea. Cut | RES 2016-07 | |||||||||
| 99 | Reinspection - Right-Of-Way Permit Fee (non-franchise) | $75.00 | RES 2016-07 | ||||||||||
| 100 | Right-Of-Way Permit Fee (franchise) | $0.00 | RES 2016-07 | ||||||||||
| 101 | Right-Of-Way Permit Fee (franchise) - with Street Cut | $0.00 | ea. Cut | RES 2016-07 | |||||||||
| 102 | Driveway, Sidewalk, and/or Curb & Gutter Const Permit Fee | $95.00 | RES 2016-07 | ||||||||||
| 103 | Reinspection - Driveway, Sidewalk, and/or Curb & Gutter Const Permit Fee | $47.00 | RES 2016-07 | ||||||||||
| 104 | Construction Permit Fee | *3.5% but not less than $700.00 | RES 2017-03 | Based on a $15,000 project | |||||||||
| 105 | * 3.5% of the total the Engineer's Estimate of the public improvements | ||||||||||||
| 106 | Construction Reinspection After 2 Failed Inspections | $64.00 | ea additional | RES 2016-07 | |||||||||
| 108 | Park & recreation fee | $5.00 | Repealed | RES 2007-09 | |||||||||