From: Sam Miller
Sent: Mon Mar 30 15:42:26 2020
To: Gerald Fisher
Subject: Compliance of Wave Broadband
Importance: Normal
Hello Gerald,
FYI.
There have been a few incidences where Wave Broadband has not pulled the required ROW permit. One being 916 South View Drive on 3/11/2020 to where Dan Huff was contacted by the home owner and the other one was over on 309 N Cole 02/24/2020. I was coming back from a ROW inspection for PGE on Christopher Street and notice work being done in the ROW. Crews stated that they were running a new service line to the home and Today over on Heintz Street behind the High School Pharmacy Wave broadband sub-contractor didn’t have the proper signage for closing the sidewalk. I had to provide sidewalk closure signs from the PW maintenance shop.
Regards,
Sam Miller | Sr. Engineer Tech.
City of Molalla
117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038
T : 503-759-0217 | E: smiller@cityofmolalla.com