From: Hassan Ibrahim

Sent: Tue Feb 10 12:00:46 2015

To: 'Jennifer Cline'

Cc: 'Curtis Cooksey'; 'Dan Huff'; 'Garrett Edmunds'

Subject: RE: Water line Connection at Molalla Ave

Importance: Normal

 

Based on the valving Garrett and I feel the same way that the existing 12” PVC and the two AC pipes are not connected.

--------------------

Hassan Ibrahim, P.E.

CURRAN-McLEOD, INC.

6655 SW Hampton St, Ste. 210

Portland, OR 97223

Tel: 503-684-3478

Fax: 503-624-8247

Cell: 503-807-2737

email: hai@curran-mcleod.com

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Tuesday, February 10, 2015 7:27 AM

To: hai@curran-mcleod.com

Cc: Curtis Cooksey; Dan Huff; Garrett Edmunds

Subject: RE: Water line Connection at Molalla Ave

Hi Hassan,

As discussed yesterday, I agree there is no room to place valve at this time. Did we determine that there is an existing cross-connections on Molalla? If so, is closing the existing valve when abandoning the lines going to create a loss of water or reverse flow situation for any nearby homes?

If determined that a valve should be placed in the future when the City is ready to address the Creamery Ck, a note should be added to the as-builts to keep record of the future need.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: Hassan Ibrahim [mailto:hai@curran-mcleod.com]

Sent: Tuesday, February 10, 2015 6:26 AM

To: Jennifer Cline; 'Garrett Edmunds'

Cc: 'Curtis Cooksey'

Subject: Water line Connection at Molalla Ave

<<...>>

Hello,

Do you see a benefit in keeping the valve on the 10” line at Molalla Ave as shown. I will revise the quantities for Stowers Rd Waterline so we are not overstocking? Please let me know.

I will forward the structural engineer recommendations when I receive them.

--------------------

Hassan Ibrahim, P.E.

CURRAN-McLEOD, INC.

6655 SW Hampton St, Ste. 210

Portland, OR 97223

Tel: 503-684-3478

Fax: 503-624-8247

Cell: 503-807-2737

email: hai@curran-mcleod.com