From: Hassan Ibrahim
Sent: Tue Feb 10 12:00:46 2015
To: 'Jennifer Cline'
Cc: 'Curtis Cooksey'; 'Dan Huff'; 'Garrett Edmunds'
Subject: RE: Water line Connection at Molalla Ave
Importance: Normal
Based on the valving Garrett and I feel the same way that the existing 12” PVC and the two AC pipes are not connected.
--------------------
Hassan Ibrahim, P.E.
CURRAN-McLEOD, INC.
6655 SW Hampton St, Ste. 210
Portland, OR 97223
Tel: 503-684-3478
Fax: 503-624-8247
Cell: 503-807-2737
email: hai@curran-mcleod.com
From: Jennifer Cline [mailto:jcline@cityofmolalla.com]
Sent: Tuesday, February 10, 2015 7:27 AM
To: hai@curran-mcleod.com
Cc: Curtis Cooksey; Dan Huff; Garrett Edmunds
Subject: RE: Water line Connection at Molalla Ave
Hi Hassan,
As discussed yesterday, I agree there is no room to place valve at this time. Did we determine that there is an existing cross-connections on Molalla? If so, is closing the existing valve when abandoning the lines going to create a loss of water or reverse flow situation for any nearby homes?
If determined that a valve should be placed in the future when the City is ready to address the Creamery Ck, a note should be added to the as-builts to keep record of the future need.
Jennifer Cline, P.E.
City of Molalla
Public Works Director
O: 503.759.0218
F: 503.829.3676
From: Hassan Ibrahim [mailto:hai@curran-mcleod.com]
Sent: Tuesday, February 10, 2015 6:26 AM
To: Jennifer Cline; 'Garrett Edmunds'
Cc: 'Curtis Cooksey'
Subject: Water line Connection at Molalla Ave
<<...>>
Hello,
Do you see a benefit in keeping the valve on the 10” line at Molalla Ave as shown. I will revise the quantities for Stowers Rd Waterline so we are not overstocking? Please let me know.
I will forward the structural engineer recommendations when I receive them.
--------------------
Hassan Ibrahim, P.E.
CURRAN-McLEOD, INC.
6655 SW Hampton St, Ste. 210
Portland, OR 97223
Tel: 503-684-3478
Fax: 503-624-8247
Cell: 503-807-2737
email: hai@curran-mcleod.com