From: Hassan Ibrahim

Sent: Thu Dec 04 10:24:01 2014

To: 'Jennifer Cline'

Cc: 'Garrett Edmunds'

Subject: RE: Streets and Water SDC project descriptions

Importance: Normal

 

Sounds good!!

--------------------

Hassan Ibrahim, P.E.

CURRAN-McLEOD, INC.

6655 SW Hampton St, Ste. 210

Portland, OR 97223

Tel: 503-684-3478

Fax: 503-624-8247

Cell: 503-807-2737

email: hai@curran-mcleod.com

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Thursday, December 04, 2014 10:18 AM

To: hai@curran-mcleod.com

Cc: Garrett Edmunds

Subject: RE: Streets and Water SDC project descriptions

I will be going to council week after next Wednesday to approve the project scope and funds for design.

Thanks,

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: Hassan Ibrahim [mailto:hai@curran-mcleod.com]

Sent: Thursday, December 04, 2014 9:42 AM

To: 'Garrett Edmunds'

Cc: Jennifer Cline

Subject: RE: Streets and Water SDC project descriptions

Hi Garrett,

As discussed at the bid opening, below is a list of the waterline projects to be designed. Please provide me with the pertinent as-built drawings and specifically the connections at the intersections for each street?

Hi Jennifer,

The survey work is all done and we are waiting for the notice to proceed from you on the design.

Your help is much appreciated,

--------------------

Hassan Ibrahim, P.E.

CURRAN-McLEOD, INC.

6655 SW Hampton St, Ste. 210

Portland, OR 97223

Tel: 503-684-3478

Fax: 503-624-8247

Cell: 503-807-2737

email: hai@curran-mcleod.com

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Tuesday, October 28, 2014 12:19 PM

To: hai@curran-mcleod.com

Cc: Garrett Edmunds; Heather Penni

Subject: Streets and Water SDC project descriptions

Hi Hassan,

Below are the project descriptions for both Water and Streets SDC Funds. Regarding the Water SDC Funding, what repairs are permitted in conjunction with the Water SDC Funding. Would this include street repairs such as; full design width paving, sidewalks and ADA Ramps?

Please provide a proposal for the design of the Water & Street SDC funding projects. The City will advertise only for the Section Street project.

Water SDC Funding

Metzler Water Line

· Begin replacement at Metzler Ave. and West Main Street to Metzler and 7th.

· Existing water line is 6 inch, consisting of steal, AC, and plastic water lines.

· Replace with 8 inch plastic.

3rd St. Water line

· Begin replacement at Lola Ave. and 3rd to Berkley and 3rd.

· Existing water line is 4 inch steal.

· Replace with 6 inch plastic.

4th St. Water line

· Begin replacement at Metzler Ave. & 4th to Hart & 4th

· Existing water line is 4 inch steal.

· Replace with 6 inch plastic.

Transfer Trout Creek Water Rights to Molalla River & Install Trout Creek Flow Monitoring Station.

Street SDC Funding

Section Street from S. Molalla to Hart

· Full width ACP Level 2 pavement rebuild from Molalla to Hart

· Install sidewalk and ADA ramps upgrades

· PCP pavement design at the intersection of Section and Hart up to 50-ft in every direction.

· Install Storm Collection System, combine with a Storm SDC Funds to extend storm line to a drainage outlet or existing system. Existing storm system is abandoned.

· Advertise RFB

Regards,

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C: