From: Jennifer Cline

Sent: Mon Apr 13 16:54:13 2015

To: hai@curran-mcleod.com; Curtis Cooksey

Subject: RE: Stowers Road, Grange Ave & Heintz Street Improvements

Importance: Normal

 

The big concern is that we may exceed the right-of-way line to catch the driveway and the cost to keep a maximum 12%. There are adjacent paved parking areas and fences along the side of several of the drives that also become a conflict.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: Hassan Ibrahim [mailto:hai@curran-mcleod.com]

Sent: Monday, April 13, 2015 2:26 PM

To: 'Curtis Cooksey'

Cc: jcline@cityofmolalla.com

Subject: RE: Stowers Road, Grange Ave & Heintz Street Improvements

Hi Curtis,

The slope through the driveway on the sidewalk side shall be a maximum of 2%but outside the sidewalk envelope it can be 8% to 12% as shown on sheet C15, detail 3. Please have Barb or Bob make contact with Jenn first. If she can’t be there to assist, I should be able to help. Let me know.

Thanks,

--------------------

Hassan Ibrahim, P.E.

CURRAN-McLEOD, INC.

6655 SW Hampton St, Ste. 210

Portland, OR 97223

Tel: 503-684-3478

Fax: 503-624-8247

Cell: 503-807-2737

email: hai@curran-mcleod.com

From: Curtis Cooksey [mailto:curtis@eagle-elsner.com]

Sent: Monday, April 13, 2015 1:53 PM

To: hai@curran-mcleod.com

Cc: jcline@cityofmolalla.com

Subject: Stowers Road, Grange Ave & Heintz Street Improvements

Hi Hassan,

The crew call in and said the driveways sloped at 2% does not match the existing driveways, some are too steep to match the existing.

We need directions how far to cut the existing driveways back, per plan it is 5’ from back of curb.

Thanks

Curtis