From: Hassan Ibrahim
Sent: Mon Jan 26 06:39:47 2015
To: 'Curtis Cooksey'
Cc: jcline@cityofmolalla.com
Subject: RE: Stowers Rd. Grange Ave. & Heintz St.
Importance: Normal
Jenn,
During the design I thought we discussed a 7 foot sidewalk in that stretch so we can slope the back of the sidewalk to the existing curb, but the plans show 8 foot. Can we narrow it to 7 foot, otherwise we may have to construct a curb at the back of the sidewalk to retain it.
Where we have a constraint we must have 4 foot clear path as per PROWAG requirements.
Please let me know your thoughts?
Thanks,
--------------------
Hassan Ibrahim, P.E.
CURRAN-McLEOD, INC.
6655 SW Hampton St, Ste. 210
Portland, OR 97223
Tel: 503-684-3478
Fax: 503-624-8247
Cell: 503-807-2737
email: hai@curran-mcleod.com
From: Curtis Cooksey [mailto:curtis@eagle-elsner.com]
Sent: Friday, January 23, 2015 3:36 PM
To: hai@curran-mcleod.com
Cc: jcline@cityofmolalla.com
Subject: Stowers Rd. Grange Ave. & Heintz St.
Hi Hassan,
When you get a chance can you look at the where the new sidewalk on Grange from Hwy 211 to about station 5+00 is to be installed.
We are going to install an 8’ concrete sidewalk at 2% cross slope from top of curb, what are we to do from the edge of sidewalk down to the existing asphalt in the parking lot?
Thanks
Curtis