From: Hassan Ibrahim

Sent: Mon Jan 26 08:12:58 2015

To: 'Curtis Cooksey'

Cc: jcline@cityofmolalla.com

Subject: RE: Stowers Rd. Grange Ave. & Heintz St.

Importance: Normal

 

Hi Curtis,

The curb on the parking lot side will be replaced to make the 8 foot sidewalk. Call me with any questions.

Thanks,

--------------------

Hassan Ibrahim, P.E.

CURRAN-McLEOD, INC.

6655 SW Hampton St, Ste. 210

Portland, OR 97223

Tel: 503-684-3478

Fax: 503-624-8247

Cell: 503-807-2737

email: hai@curran-mcleod.com

From: Hassan Ibrahim [mailto:hai@curran-mcleod.com]

Sent: Monday, January 26, 2015 6:40 AM

To: 'Curtis Cooksey'

Cc: 'jcline@cityofmolalla.com'

Subject: RE: Stowers Rd. Grange Ave. & Heintz St.

Jenn,

During the design I thought we discussed a 7 foot sidewalk in that stretch so we can slope the back of the sidewalk to the existing curb, but the plans show 8 foot. Can we narrow it to 7 foot, otherwise we may have to construct a curb at the back of the sidewalk to retain it.

Where we have a constraint we must have 4 foot clear path as per PROWAG requirements.

Please let me know your thoughts?

Thanks,

--------------------

Hassan Ibrahim, P.E.

CURRAN-McLEOD, INC.

6655 SW Hampton St, Ste. 210

Portland, OR 97223

Tel: 503-684-3478

Fax: 503-624-8247

Cell: 503-807-2737

email: hai@curran-mcleod.com

From: Curtis Cooksey [mailto:curtis@eagle-elsner.com]

Sent: Friday, January 23, 2015 3:36 PM

To: hai@curran-mcleod.com

Cc: jcline@cityofmolalla.com

Subject: Stowers Rd. Grange Ave. & Heintz St.

Hi Hassan,

When you get a chance can you look at the where the new sidewalk on Grange from Hwy 211 to about station 5+00 is to be installed.

We are going to install an 8’ concrete sidewalk at 2% cross slope from top of curb, what are we to do from the edge of sidewalk down to the existing asphalt in the parking lot?

Thanks

Curtis