From: Jennifer Cline
Sent: Thu Jun 04 15:11:14 2015
To: Buehler, John A.
Cc: Hash, Kenneth F.; White, Maureen P.; Dan Zinder
Subject: Re: Molalla Urban Renewal Project - W Heintz Street - Addendum #4
Importance: Normal
Attachments: image002.png; Hi, This looks good to me. Approved Dan- please post. Thank you, Jenn Sent from my iPhone On Jun 4, 2015, at 1:42 PM, Buehler, John A. <BuehlerJ@hdjdg.com> wrote: Hey Jenn, Please find the attached revisions to the Addendum. After discussion with Maureen and Ken calendar days will be used. Section 00180.50 was modified to include the non working calendar days. Calendar days were revised to 115 days to reflect the 80 working days proposed for the project (placing the approximate completion date as 10/26/2015). The revisions to the bid proposal were made as well. The changes to the quantities were per the Q&A. However, excavation for pipes did not affect these. Per the Standard Specifications in Section 00445.90, no additional payment shall be made for trench excavation for pipe work. Thanks, John A. Buehler, E.I.T. | Engineer II HDJ DESIGN GROUP, PLLC Engineers | Landscape Architects | Planners | Surveyors 314 W. 15th Street, Vancouver, WA 98660-2927 Phone: 360/695-3488 ext. 2107, Fax: 360/695-8767 From: Jennifer Cline [mailto:jcline@cityofmolalla.com] Sent: Thursday, June 4, 2015 11:58 AM To: Buehler, John A. Cc: Hash, Kenneth F.; White, Maureen P.; Dan Zinder Subject: RE: Molalla Urban Renewal Project - W Heintz Street - Addendum #4 Hi again, I also think the quantity change should identify it is for “Project Bid Proposal, Schedule A” since there are two schedules. I was wondering if the quantity is due to the clarification in the Q&A? If so, is the excavation for the Storm incidental to the L.F. cost? Jennifer Cline, P.E. City of Molalla Public Works Director O: 503.759.0218 F: 503.829.3676 From: Buehler, John A. [mailto:BuehlerJ@hdjdg.com] Sent: Thursday, June 04, 2015 9:50 AM To: Jennifer Cline Cc: Hash, Kenneth F.; White, Maureen P.; Dan Zinder Subject: Molalla Urban Renewal Project - W Heintz Street - Addendum #4 Good Morning Jenn, Attached is Addendum #4 for your review. Please also find a list of questions that we have received yesterday on the contract plans, with responses. If you have any questions, please let us know. Thank you, John A. Buehler, E.I.T. | Engineer II HDJ DESIGN GROUP, PLLC Engineers | Landscape Architects | Planners | Surveyors 314 W. 15th Street, Vancouver, WA 98660-2927 Phone: 360/695-3488 ext. 2107, Fax: 360/695-8767 DISCLAIMER: This electronic message and any attachments are supplied in good faith and are believed to be virus free. HDJ Design Group, PLLC accepts no responsibility for the damage or loss (arising from negligence or otherwise) which may occur through the use or transmission of this message and attachments. The contents of this electronic message and any attachments are intended only for the addressee and may contain privileged or confidential information. If you are not the addressee, you are notified that any transmission, distribution, downloading, printing or photocopying of the contents of this message or attachments is strictly prohibited. The privilege of confidentiality attached to this message and any attachments is not waived, lost or destroyed by reason of mistaken delivery to you. If you receive this message in error, please notify the sender by return email or telephone by calling (360) 695-3488. <Addendum_No4.pdf>