From: Jennifer Cline
Sent: Wed Apr 29 17:10:25 2015
To: Hash, Kenneth F.
Cc: White, Maureen P.; Buehler, John A.
Subject: RE: Heintz street - west end
Importance: Normal
Attachments: Molalla Signed Plans.pdf; Addendum #1.pdf; Preconstruction Agenda_JC.docx; 1613 Molalla Stowers Heintz Grange Rdwy Rehab Bid Tab.pdf; Neighboorhood Notification memo.doc; image001.png; What is the added cost from the previous plan of grind and inlay? Does it include the added curb at gutter cost? Also, I noticed Level 2 ACP is estimated at $100/ton. This seems a bit high and should decrease with the increased quantities. Notice the three lowest bidders are all under $85/ton. http://www.cityofmolalla.com/sites/default/files/fileattachments/public_works/page/1507/notice_of_intent_-_molalla_-_stowers.pdf Also, here the main link for the Stower’s project. http://www.cityofmolalla.com/rfps?field_bid_rfp_status_value_1=awarded&=Apply Here’s some attached information on the Stower’s, Grange & Heintz project. I will look into finding the emails where to publish the RFP if you still need me too? Thank you, Jennifer Cline, P.E. City of Molalla Public Works Director O: 503.759.0218 F: 503.829.3676 From: Hash, Kenneth F. [mailto:HashK@hdjdg.com] Sent: Wednesday, April 29, 2015 1:51 PM To: Jenn Cline (jcline@cityofmolalla.com) Cc: White, Maureen P.; Buehler, John A. Subject: RE: Heintz street - west end See correction below From: Hash, Kenneth F. Sent: Wednesday, April 29, 2015 1:42 PM To: Jenn Cline (jcline@cityofmolalla.com) Cc: White, Maureen P.; Buehler, John A. Subject: Heintz street - west end Full reconstruction Excavate full depth and replace with 4 inches AC over 14-inches AB = $81K Partial reconstruction Remove AC plus 2-inches AB – replace with 6-inches AC = $65K Kenneth F. Hash | Senior Transportation Manager HDJ DESIGN GROUP, PLLC Engineers | Landscape Architects | Planners | Surveyors 314 W. 15th Street, Vancouver, WA 98660 Phone: 360/695-3488 ext. 2122, Fax: 360/695-8767 Cell: 360/931-7551