From: Jennifer Cline

Sent: Wed Sep 02 15:46:49 2015

To: Hash, Kenneth F.

Cc: Dennis Welle

Subject: RE: Heintz Street - Pipe Materials - Submintal #5.0 Approved As Noted.

Importance: Normal

 

Regarding #9, the City uses a connection that is brass not bronze.

It is a Mueller Ball Compression Meter Valve #B24258

I will work on getting the partial approval to you soon.

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

From: Hash, Kenneth F. [mailto:HashK@hdjdg.com]

Sent: Thursday, August 27, 2015 10:27 AM

To: Jenn Cline (jcline@cityofmolalla.com) <jcline@cityofmolalla.com>

Subject: FW: Heintz Street - Pipe Materials - Submintal #5.0 Approved As Noted.

Jenn

Here are the following comments for the material that was resubmitted and items still needing attention:

1. Need a new submittal for 6” Wall Drain Pipe that is listed on the ODOT QPL list for drain pipes.

2. Gasket cut sheets submitted this revised submittal recommended for approval.

3. Approved part of partial approval – 7/21/2015

4. Where will the cast iron flanged fittings be used? P. 29 – F-02 10x6 Flg Tee (Plans call for an MJ Tee not Flg Tee)

5. Approved part of Partial Approval 7/21/2015

6. Need cut sheets for cast iron valve box/lid. – Need statement from manufacturer saying that material is H20 load rated.

7. Where will the 6” DIP be used? P. 40 – Fire Hydrant Lateral – Need to know Class of pipe planned for use and verification that DI is cement mortar lined per AWWA C104 (ODOT Section 02470.20)

8. Need cut sheets for the water service connections p. 41 – Are these compatible with PEX tubing? Service connections are to be PEX per plans.

9. Ball and Straight valves need to be bronze alloy p. 43 – Submitted Valve Listed is the ‘City Standard’ Is the Iron Ball and Straight Valve the City standard?

10. Where will the schedule 40 pipe be used? – I-09 ¾” Service/I-11 1” Service/I-12 1” Service – Not Approved – Services are to be PEX tubing per plans.

11. Remove sheet 49

12. What size is the check valve? P. 50 – Need size still

13. Fasteners need to be Grade A or B – Recommended for approval

14. Remove the submittal for the flow control tee, I submitted that separately.

From: Nick Jones [mailto:nickj@wtc-inc.com]

Sent: Wednesday, August 26, 2015 3:12 PM

To: Hash, Kenneth F. <HashK@hdjdg.com>

Cc: Jennifer Cline <jcline@cityofmolalla.com>

Subject: Heintz Street - Pipe Materials - Submintal #5.0 Approved As Noted.

Ken,

Please see the attached information from our pipe supplier regarding the pipe materials submittal. Please let me know if you would like us to submit anything else?

Thank you,

Nick Jones

Project Manager

Westech Construction, Inc.

Office: 503-777-7000

Cell: 503-969-1447

Fax: 503-774-3191

From: Bob.Fox@Ferguson.com [mailto:Bob.Fox@Ferguson.com]

Sent: Friday, August 21, 2015 12:46 PM

To: nickj@wtc-inc.com

Cc: Koby.Rogers@Ferguson.com

Subject: RE: Heintz Street - Pipe Materials - Submintal #5.0 Approved As Noted.

Nick,

Sorry to take so long to respond to below. Some miscommunication on our part. Attached resubmittal info. Looks like Items #2, 3, 6, 8, and 13 are the only ones that needed to be addressed. Please correct me if I am wrong. Please let us know what else needs to be done. Thanks,

Bob Fox

Branch Manager

Ferguson Waterworks

A Wolseley Company

14103 NW 3rd Court

Vancouver, Wa 98685

Office Ph 360-896-8708

Fax 360-896-8820

Mobile 503-793-4554

bob.fox@ferguson.com

From: Nick Jones [mailto:nickj@wtc-inc.com]

Sent: Tuesday, August 18, 2015 12:34 PM

To: Rogers, Koby [Ferguson] - 1536 Vancouver

Cc: Fox, Bob [Ferguson] - 1536 Vancouver

Subject: RE: Heintz Street - Pipe Materials - Submintal #5.0 Approved As Noted.

Koby,

Do you have an update on the submittal items?

Thank you,

Nick Jones

Project Manager

Westech Construction, Inc.

Office: 503-777-7000

Cell: 503-969-1447

Fax: 503-774-3191

From: Koby.Rogers@Ferguson.com [mailto:Koby.Rogers@Ferguson.com]

Sent: Thursday, August 06, 2015 7:18 AM

To: nickj@wtc-inc.com

Cc: Koby.Rogers@Ferguson.com; Bob.Fox@Ferguson.com

Subject: RE: Heintz Street - Pipe Materials - Submintal #5.0 Approved As Noted.

Nick

Please see notes below

We will track down cut sheets on items that may have been ‘missing’

Thanks Nick

Koby Rogers

Project Manager

Ferguson Waterworks

Cell # 971-226-4607

From: Nick Jones [mailto:nickj@wtc-inc.com]

Sent: Monday, July 27, 2015 10:34 AM

To: Rogers, Koby [Ferguson] - 1536 Vancouver

Cc: Fox, Bob [Ferguson] - 1536 Vancouver; Scott, Randal [Ferguson] - 3011 Portland WW

Subject: Heintz Street - Pipe Materials - Submintal #5.0 Approved As Noted.

Importance: High

Koby,

Please see the attached submittal comments. Please review and resubmit items. I have listed the items needed below, please double check me though.

1. ADS Pipe not approved. Was that only for the flow control tee? 6” Retaining Wall Drain

2. Need gasket cut sheet, p. 27

3. Gasket/Bolt packs p. 27

4. Where will the cast iron flanged fittings be used? P. 29 – F-02 10x6 Flg Tee

5. Where will the resilient wedge gate valve be used? Fire Hydrants? P. 34 – Yes – Hydrant Assembly

6. Need cut sheets for cast iron valve box/lid.

7. Where will the 6” DIP be used? P. 40 – Fire Hydrant Lateral

8. Need cut sheets for the water service connections p. 41

9. Ball and Straight valves need to be bronze alloy p. 43 – Submitted Valve Listed is the ‘City Standard’

10. Where will the schedule 40 pipe be used? – I-09 ¾” Service/I-11 1” Service/I-12 1” Service

11. Remove sheet 49

12. What size is the check valve? P. 50

13. Fasteners need to be Grade A or B

14. Remove the submittal for the flow control tee, I submitted that separately.

Thank you,

Nick Jones

Project Manager

Westech Construction, Inc.

Office: 503-777-7000

Cell: 503-969-1447

Fax: 503-774-3191

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Tuesday, July 21, 2015 9:35 AM

To: 'Nick Jones'

Cc: 'Buehler, John A.'; Hash, Kenneth F.; Dennis Welle; 'Adam Shultz'

Subject: Pipe Materials - Submintal #5.0 Approved As Noted.

Hi Nick,

Please see attached submittal #5 that is approved as noted. Please address comments and re-submit for non-approved items.

Sincerely,

Jennifer Cline, P.E.

City of Molalla

Public Works Director

117 N Molalla Ave.

PO Box 248 *

Molalla, OR 97038

O: 503.759.0218

F: 503.829.3676

image "file:///C: