From: Hassan Ibrahim

Sent: Fri Feb 06 11:26:59 2015

To: 'Jennifer Cline'

Cc: 'Garrett Edmunds'; 'Dan Huff'

Subject: RE: Heintz & Molalla buried bridge photo

Importance: Normal

 

Thanks, Curt and I will be joined by Mark Nelson, structural engineer to look at this situation in the field on Monday at 2:00 pm. Please try to be there if you can.

Thanks.

--------------------

Hassan Ibrahim, P.E.

CURRAN-McLEOD, INC.

6655 SW Hampton St, Ste. 210

Portland, OR 97223

Tel: 503-684-3478

Fax: 503-624-8247

Cell: 503-807-2737

email: hai@curran-mcleod.com

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Friday, February 06, 2015 9:58 AM

To: Hassan Ibrahim

Cc: Garrett Edmunds; Dan Huff

Subject: Heintz & Molalla buried bridge photo

Hi Hassan,

Here’s a photo of the corner wing wall of the concrete bridge under Molalla Ave. Sounds like the 48” corrugated steel culvert pipe does not run through the structure. Please let me know what solution options you come up with. I’m hoping we can loop around the structure.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C: