Hi Hassan,

Dan and I went out to Heintz today looking at the planned dig-outs. The actual pavement failure well exceeds the planned dig-outs and extends from N Molalla to Grange. Our proposal is to do the following:

1. Prep trenches

2. Continue to grind 2” at curb line for 6 ft

3. Grind center roadway 3” for 28 ft

4. Place fabric for separation with in the 28 ft

5. Pave back 3” of PG 64-22, Level 3

6. Overlay 2” as planned

I believe this will save time and cost, and produced a better product for the City.