From: Jennifer Cline

Sent: Wed Dec 03 16:29:32 2014

To: 'psmall@pacnorthinvest.com'

Cc: Nicolas Lennartz; Garrett Edmunds

Subject: Sidewalk Permit

Importance: Normal

Attachments: Sidewalk & Driveway Construction Permit 2014-15 Fillable.pdf; rd750.pdf;

 

Hi Phillip,

After finishing our call I noticed I do not have a permit on file for either Garden Ct. addresses that were inspected today. I have attached a copy of the permit for you to complete. Typically when the permitted is submitted a drawing of the work to be performed and the type of approach is discussed. We typically want to see continuity through the neighborhood.

In the case of Ruth’s Garden, the chosen design matches Option M, Partially Lowered Sidewalk. See attached detail. However, if you can meet the Max 12% Apron Grade without lowering the sidewalk, that is acceptable. Which I believe is currently constructed. The wings are 3’-6” nominally.

Please let me know if you have any questions.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676