From: Jennifer Cline

Sent: Thu Jun 25 16:40:28 2015

To: Christine Hein

Subject: RE: WWTP Headworks pH Probe

Importance: Normal

Attachments: image001.jpg;

 

Yes, but Portland is set up differently than most City’s, they have a whole department dedicated to sso’s. They are out of my league. J

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: Christine Hein [mailto:CHein@ringbenderlaw.com]

Sent: Thursday, June 25, 2015 4:27 PM

To: Jennifer Cline

Subject: RE: WWTP Headworks pH Probe

Sounds good- thanks! the City of Portland example should be helpful too.

Christine L. Hein

Ring Bender LLLP

Direct: 503.964.6726

Cell: 503.314.0958

P Please consider the environment before printing this e-mail.

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Thursday, June 25, 2015 4:18 PM

To: Christine Hein

Subject: RE: WWTP Headworks pH Probe

Oh slow going, but I’m working on it about half of my day. I don’t know if I’ll have the entire draft complete by Friday but I will send what I have tomorrow. I’m using the same format we used for the I/I plan and building if from the WERF ERP guidance for WW Systems.

We may need to send the draft without Figures and Appendices until the final draft. However, it will be something better than we have today.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: Christine Hein [mailto:CHein@ringbenderlaw.com]

Sent: Thursday, June 25, 2015 4:14 PM

To: Jennifer Cline

Cc: Dan Huff; J.W. Ring; Mark Strandberg; Phillip Bender

Subject: RE: WWTP Headworks pH Probe

Thanks for forwarding, Jen.

How are things coming with the ERP draft? I don’t work on Fridays, but can be available by cell if you want to discuss, and I will keep an eye out for the draft.

Thanks,

Tina

Christine L. Hein

Ring Bender LLLP

Direct: 503.964.6726

Cell: 503.314.0958

P Please consider the environment before printing this e-mail.

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Thursday, June 25, 2015 3:58 PM

To: Christine Hein

Cc: Dan Huff

Subject: FW: WWTP Headworks pH Probe

FYI – this work is as part of the NPDES requirements. We will also have the required temperature gauge at the river up and running once the permanent installation is complete and the VPN connection is made.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: Randy Bos [mailto:rjb@industrialsystems-inc.com]

Sent: Thursday, June 25, 2015 3:47 PM

To: Jennifer Cline

Cc: Troy Collison; John Sowards

Subject: WWTP Headworks pH Probe

Hi Jennifer,

This morning John and I were out at the treatment plant. He was checking control panels for spare relays and terminals for the drive signal modifications and I picked up the Lab Data. The pH meter values are tracking the grab sample pH values very well. I would recommend proceeding with the installation based on the past several weeks of data. Please review the attached table and chart. Also is a pdf copy if you need to send it off to DEQ.

Thanks for gathering the data for us.

Randy

Randal J. Bos

imageimage

 

5835 NE 122nd Avenue, Suite #110

Portland, Oregon 97230

http://www.industrialsystems-inc.com

Phone: 503.262.0367 x- 310

Cell: 360.904.7087

Fax: 503.262.0371

CCB # 196597 WA #INDUSSI880K9