From: Jennifer Cline
Sent: Thu Jun 25 16:40:28 2015
To: Christine Hein
Subject: RE: WWTP Headworks pH Probe
Importance: Normal
Attachments: image001.jpg; Yes, but Portland is set up differently than most City’s, they have a whole department dedicated to sso’s. They are out of my league. J Jennifer Cline, P.E. City of Molalla Public Works Director O: 503.759.0218 F: 503.829.3676 From: Christine Hein [mailto:CHein@ringbenderlaw.com] Sent: Thursday, June 25, 2015 4:27 PM To: Jennifer Cline Subject: RE: WWTP Headworks pH Probe Sounds good- thanks! the City of Portland example should be helpful too. Christine L. Hein Ring Bender LLLP Direct: 503.964.6726 Cell: 503.314.0958 P Please consider the environment before printing this e-mail. From: Jennifer Cline [mailto:jcline@cityofmolalla.com] Sent: Thursday, June 25, 2015 4:18 PM To: Christine Hein Subject: RE: WWTP Headworks pH Probe Oh slow going, but I’m working on it about half of my day. I don’t know if I’ll have the entire draft complete by Friday but I will send what I have tomorrow. I’m using the same format we used for the I/I plan and building if from the WERF ERP guidance for WW Systems. We may need to send the draft without Figures and Appendices until the final draft. However, it will be something better than we have today. Jennifer Cline, P.E. City of Molalla Public Works Director O: 503.759.0218 F: 503.829.3676 From: Christine Hein [mailto:CHein@ringbenderlaw.com] Sent: Thursday, June 25, 2015 4:14 PM To: Jennifer Cline Cc: Dan Huff; J.W. Ring; Mark Strandberg; Phillip Bender Subject: RE: WWTP Headworks pH Probe Thanks for forwarding, Jen. How are things coming with the ERP draft? I don’t work on Fridays, but can be available by cell if you want to discuss, and I will keep an eye out for the draft. Thanks, Tina Christine L. Hein Ring Bender LLLP Direct: 503.964.6726 Cell: 503.314.0958 P Please consider the environment before printing this e-mail. From: Jennifer Cline [mailto:jcline@cityofmolalla.com] Sent: Thursday, June 25, 2015 3:58 PM To: Christine Hein Cc: Dan Huff Subject: FW: WWTP Headworks pH Probe FYI – this work is as part of the NPDES requirements. We will also have the required temperature gauge at the river up and running once the permanent installation is complete and the VPN connection is made. Jennifer Cline, P.E. City of Molalla Public Works Director O: 503.759.0218 F: 503.829.3676 From: Randy Bos [mailto:rjb@industrialsystems-inc.com] Sent: Thursday, June 25, 2015 3:47 PM To: Jennifer Cline Cc: Troy Collison; John Sowards Subject: WWTP Headworks pH Probe Hi Jennifer, This morning John and I were out at the treatment plant. He was checking control panels for spare relays and terminals for the drive signal modifications and I picked up the Lab Data. The pH meter values are tracking the grab sample pH values very well. I would recommend proceeding with the installation based on the past several weeks of data. Please review the attached table and chart. Also is a pdf copy if you need to send it off to DEQ. Thanks for gathering the data for us. Randy Randal J. Bos 5835 NE 122nd Avenue, Suite #110 Portland, Oregon 97230 http://www.industrialsystems-inc.com Phone: 503.262.0367 x- 310 Cell: 360.904.7087 Fax: 503.262.0371 CCB # 196597 WA #INDUSSI880K9