From: Jennifer Cline
Sent: Tue Aug 26 16:40:42 2014
To: Howie, Joel; Bezner, Mike
Cc: Harmon, Randy; Hall, Vince; Harmon, Rick
Subject: RE: Wilhoit Rd. - Failing Structure
Importance: Normal
Thanks everyone for the responses.
Just curious if the contractor will be doing a full closure of the structure or constructing half at a time? I have not seen any posted signs indicating construction impacts to local residents or project duration.
Thanks,
Jenn
From: Howie, Joel [mailto:JHowie@co.clackamas.or.us]
Sent: Tuesday, August 26, 2014 4:32 PM
To: Bezner, Mike; Jennifer Cline
Cc: Harmon, Randy; Hall, Vince; Harmon, Rick
Subject: RE: Wilhoit Rd. - Failing Structure
Mike and Jennifer,
Thanks for the email. Rick Harmon said he will take a look at it tomorrow. However, the contractor is not slated to start until September 8th.
Joel
From: Bezner, Mike
Sent: Tuesday, August 26, 2014 9:56 AM
To: Jennifer Cline; Harmon, Randy
Cc: Howie, Joel
Subject: RE: Wilhoit Rd. - Failing Structure
We do have a contractor that is about to begin work on fixing this. I’m copying Joel Howie as well, who is our capital projects manager.
From: Jennifer Cline [mailto:jcline@cityofmolalla.com]
Sent: Tuesday, August 26, 2014 9:47 AM
To: Harmon, Randy
Cc: Bezner, Mike
Subject: Wilhoit Rd. - Failing Structure
Hi Randy,
I know your busy so I will keep this short. I have a public safety concern with Wilhoit Rd. that I use every day to commute to and from Molalla. Recently it has been more difficult to see the NB oncoming vehicles when at the SB stop sign. Many NB vehicles don’t stop either. Recently I’ve seen several skid marks in the NB lane, assuming there are some sight distance issues. Can you have someone take a look at cutting the brush back on the inside of the curve to the right of way to improve sight distance. It also appears the asphalt in failing more and more into the travel lane.
Thank you and let me know if you need photos or anything.
Jennifer Cline, P.E.
City of Molalla
Public Works Director
O: 503.829.6855 Ext. #218
F: 503.829.3676