From: Jennifer Cline
Sent: Mon Sep 22 13:01:38 2014
To: cjm@curran-mcleod.com
Cc: Garrett Edmunds; Dan Huff
Subject: RE: Wastewater Treatment Plant Vactor Receiving Station
Importance: Normal
Attachments: VactorTruckDumpSite_Comments.pdf; Hi Curt, I was out of the office on Friday, so I apologize for the delayed response. I am having Garrett look over the design and will get back to you tomorrow sometime if he has anything additional to add. Will you have an itemized engineers estimate also? I would like something to compare to any bids we receive. Here are my comments: · Silt Fence should be installed on downhill side prior to any grading work and inspected by the City. · The existing fence will be removed and reset by the City, any damage will be at the contractors expense. · Should there be free draining material on top of the footings behind the wall to prevent erosion or other stability issues? · If not already, please include a Pre-construction meeting in the specials Thanks, Jenn From: Curt McLeod [mailto:cjm@curran-mcleod.com] Sent: Thursday, September 18, 2014 5:41 PM To: Jennifer Cline; Garrett Edmunds Subject: Wastewater Treatment Plant Vactor Receiving Station Hi Jenn & Garrett, Attached is a draft of the vactor spoils receiving station to stimulate our discussion. I have added a bar screen and slide gate, and have eliminated most of the dual sloped floor so the floor can be access with a front end loader. Please take a look and let’s talk again. We will prepare a brief specification document that will have the contract requirements and a bid form to solicit bids when you want to move forward. Thanks ************************************ Curt McLeod P.E. CURRAN-McLEOD, INC. 6655 S.W. Hampton Street, Suite 210 Portland, Oregon 97223 T: (503) 684-3478 F: (503) 624-8247 C: (503) 475-0431 email: cjm@curran-mcleod.com