From: Jennifer Cline
Sent: Wed Apr 27 14:53:53 2016
To: Greg Spence
Cc: Sarah Kennedy; Mike Houck; Daphne Lisac; Chris Link
Subject: RE: Utility Conflict ( water)
Importance: Normal
Hi Greg,
Do you have a proposed adjustment to the staging or water line design to address the conflict?
Jennifer Cline, P.E. | Public Works Director
Licensed in OR, WA
117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038
O: 503.759.0218 | F: 503.829.3676
From: Greg Spence [mailto:greg@houckco.com]
Sent: Wednesday, April 27, 2016 1:54 PM
To: 'Jennifer Cline' <jcline@cityofmolalla.com>; 'Chris Link' <Chris.Link@msa-ep.com>
Cc: 'Sarah Kennedy' <sarah@houckco.com>; 'Mike Houck' <mike@houckco.com>
Subject: Utility Conflict ( water)
Jennifer,
Existing water main Sta. 24+88 +-, in conflict with 30” storm line.
Top of water main 362.7, design flow line 360.3 +-, Please advise. This conflict is also between SDMH 16, and SDMH 14.
Water main to be replaced in stage 2 of project.
All if you need more Information,
Thank you
Greg Spence
503-931-3982