From: Jennifer Cline

Sent: Tue Sep 15 10:37:11 2015

To: Phillip Bender

Cc: Amy Barreto; Christine Hein; Mark Strandberg; Lee, Rob

Subject: RE: RFP for CCTV

Importance: Normal

Attachments: Executive Summary.pdf; Chapter 6 - Collection System.pdf;

 

Hi Phil,

 

Regarding your comments 3 & 4. These bullet items were taken directly

from the Executive Summary of the Molalla Wastewater Facilities Plan

(WWFP). See page ES-2 of the attached. I have no evidence that any I & I

work was completed in the City since the WWFP was completed in 2000.

Chapter 6 even recommends not doing anything on the bottom of page 6-5. We

know I & I work was completed prior to 2000, but not since. The grouting

conditions would be at least the same, possibly worse today.

 

I've also included Chapter 6 that covers the collection systems. Table

6.1 provides data from a completed flow monitoring analysis completed in

1999. The January 22 storm events does show surcharging in several

locations. Since this study, Big Meadows has built out completely and

there have been other areas of growth. On the map (Figure 6-1) provided I

don't see Safeway or the other industrial collection lines.

 

I will make the changes below, let me know if you would still like me to

reword those bulleted items.

 

Thanks,

 

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla <http://www.cityofmolalla.com/>

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

 

-----Original Message-----

From: Phillip Bender [mailto:PBender@ringbenderlaw.com]

Sent: Tuesday, September 15, 2015 9:02 AM

To: Jennifer Cline <jcline@cityofmolalla.com>

Cc: Amy Barreto <abarreto@ringbenderlaw.com>; Christine Hein

<CHein@ringbenderlaw.com>; Mark Strandberg

<MStrandberg@ringbenderlaw.com>; Phillip Bender

<PBender@ringbenderlaw.com>

Subject: Re: RFP for CCTV

 

Jennifer,

 

I reviewed and have a couple comments and questions on the RFP:

 

1.  Page 1, second paragraph of section 2, Background. "The lesser of

the

system flows from the south side of the City and drains along Highway

211/Main St, diverting at Bear Creek and onto the WWTP" should be revised

to read as follows: "The lesser portion of thesystem flows from the south

side of the City along Highway 211/Main St to a location near Bear Creek,

where it turns and flows into the WWTP."

 

 

2.  Page 1, third paragraph of section 2, Background. "Whether" should

be

changed to "weather".

 

3.  Page 1, bullets to third paragraph. How do we know the following?

"A

significant portion of the previous I/I reduction work (grouting) work has

exceeded its useful life and has failed." Where does this information come

from? Do we have direct evidence that it "has failed"? I suggest rewriting

this sentence to read, "Previous I/I reduction work (grouting) has now

exceeded its design life."

 

4.  Page 1, bullets to third paragraph. How do we know the following?

"Facilities are generally hydraulically overloaded during winter storm

events." Where does this conclusion come from? All facilities are

hydraulically overloaded? I did not understand this to be the case. What

about saying, "Certain locations within the collection system can become

hydraulically overloaded during winter storm events" or something similar?

 

5.  WWTP line. It is not clear from the WWTP plan drawings or

descriptions

that the Bear Creek outfall from Bear Creek up as close to or into the

WWTP is included in the RFP. It needs to be. The Consent Decree requires

us to inspect from the outfall up the outfall line.

 

Let me know if any of my comments don't make sense or you want to discuss.

Let me know what the answers are to the questions.

 

Thanks.

 

Phil

 

Phillip M. Bender - Partner

 

925 Liberty Ave., 8th Floor

Pittsburgh, PA 15222

(412) 770-7721

pbender@ringbenderlaw.com

www.ringbenderlaw.com

 

 

Ring Bender McKown & Castillo LLLP

 

 

This transmission is intended for the sole use of the individual or entity

to whom it is addressed, and may contain information that is privileged,

confidential and exempt from disclosure under applicable law. You are

hereby notified that any dissemination, distribution or duplication of

this transmission by someone other than the intended addressee or its

designated agent is strictly prohibited. If your receipt of this

transmission is in error, please notify this firm immediately by telephone

at

(503) 964-6730, or reply to this transmission. Thank you.

 

 

 

 

 

 

 

 

On 9/14/15 7:52 PM, "Jennifer Cline" <jcline@cityofmolalla.com> wrote:

 

>Hi Phil,

>

>Have you had a chance to look over the RFP? I would like to post it on

>Wednesday if you think it looks good.

>

>Thanks,

>

>Jennifer Cline, P.E. | Public Works Director

>

>Licensed in OR, WA

>

>City of Molalla <http://www.cityofmolalla.com/>

>

>117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

>

>O: 503.759.0218 | F: 503.829.3676

>

>-----Original Message-----

>From: Phillip Bender [mailto:PBender@ringbenderlaw.com]

>Sent: Wednesday, September 09, 2015 7:15 PM

>To: Jennifer Cline <jcline@cityofmolalla.com>

>Cc: Lee, Rob <roblee@BrwnCald.com>; Christine Hein

><CHein@ringbenderlaw.com>; Dan Huff <dhuff@cityofmolalla.com>

>Subject: Re: RFP for CCTV

>

>I'll take a look and let you know.

>

>Phillip M. Bender

>Ring | Bender

>(412) 770-7721

>

>> On Sep 9, 2015, at 5:25 PM, Jennifer Cline <jcline@cityofmolalla.com>

>wrote:

>>

>> Hi Phil,

>>

>> I just completed a final draft of the RFP for the CCTV Work as

>identified in our I/I plan. See attached.

>>

>> In the plan is an updated map of the storm system at the WWTP. I

>> have

>identified several storm lines to inspect. What is your take on the

>current plan for inspection? Do you feel there is more identified than

>needed?

>>

>> If you have any other comments, please let me know.

>>

>> Thanks,

>>

>> Jennifer Cline, P.E. | Public Works Director Licensed in OR, WA City

>> of Molalla<http://www.cityofmolalla.com/>

>> 117 N Molalla Ave. | PO Box 248 . |Molalla, OR 97038

>> O: 503.759.0218 | F: 503.829.3676

>> [X]<http://www.cityofmolalla.com/>

>> <Draft_RFP_CCTV_Sanitary Sewer.pdf>

>