From: Jennifer Cline
Sent: Tue Dec 23 12:58:20 2014
To: Garrett Edmunds
Subject: RE: Paving
Importance: Normal
Not at all
Jennifer Cline, P.E.
City of Molalla
Public Works Director
O: 503.759.0218
F: 503.829.3676
From: Garrett Edmunds [mailto:gedmunds@cityofmolalla.com]
Sent: Tuesday, December 23, 2014 11:23 AM
To: Jennifer Cline
Subject: RE: Paving
Do you mind if I forward this to Scott?
From: Jennifer Cline [mailto:jcline@cityofmolalla.com]
Sent: Tuesday, December 23, 2014 10:52 AM
To: Garrett Edmunds
Subject: RE: Paving
Hi Garrett,
He can pave if the following conditions can be met:
· A pre-paving meeting must be scheduled in advance and includes the contractor(himself), paving sub, testers and the City reps.
· The city needs to verify the mix design meets the Level 2, PG 64-22 - ½” Dense HMAC requirements (as stated on the plans), I need the JMF at least 24 hours in advance of the pre-paving meeting.
· Temperature must be 40 degrees minimum and rising measured on the rock/ground
· No standing water is allowed (puddles)
Also, ask him if he knows the tonnage to be placed to determine if the work can qualify under minor HMAC. I’m assuming not, but wanted to clarify.
Jennifer Cline, P.E.
City of Molalla
Public Works Director
O: 503.759.0218
F: 503.829.3676
From: Garrett Edmunds [mailto:gedmunds@cityofmolalla.com]
Sent: Tuesday, December 23, 2014 10:17 AM
To: Jennifer Cline
Subject: Paving
Hello,
I spoke with Scott Hewitt this morning about paving on 12-29 or 12-30. The weather repot says clear and cold 41/21. If it is that cold shall we tell them to hold off?
Thanks
Garrett Edmunds
Operation Division Supervisor
117 N Molalla Ave PO Box 248
Molalla, OR 97038
503-829-5401
503-829-3676(fax)