From: Jennifer Cline

Sent: Fri Jul 24 12:09:13 2015

To: Craig Loughridge

Cc: Gerald Fisher

Subject: RE: Path Plan Updates

Importance: Normal

Attachments: BearCreek_Sheet140_Comments.pdf; Geotech-Memo_Stamped_2014-08-18.pdf;

 

Hi Craig,

We also had comments on Sheet 140, however it looks it did not come through on my previous scan. I have rescanned Sheet 140.

We have a concern with the elevation of the footings regarding scour. The bottom of the footing in the current design is only 1 foot below OHW elevation. Typically you would see the footing at a minimum 3 feet below the existing OHW to protect for scour . You may also consider some rock armoring to further protect from scour if needed. This is something that should be discussed with the geotech and possibly the bridge manufacturer as well.

Regards,

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: Craig Loughridge [mailto:pioneer@bybryson.com]

Sent: Thursday, July 23, 2015 1:36 PM

To: Jennifer Cline <jcline@cityofmolalla.com>

Subject: Re: Path Plan Updates

Hi Jennifer,

Attached files are response from Evan Kristof of PSU regarding the path plans. Evan writes:

“I have made revisions to to path plan set to address Jennifer's comments. A clean set of revised drawings are included, as well as a mark-up of Jennifer's comments, showing which were addressed (and answering her questions).”

Evan also sent along a copy of the hydraulic report referenced in the plans (also attached).

Best Wishes... Craig

Craig Loughridge

Project Manager

Molalla Community Builders/Bear Creek Byway

P.O. Box 105, Molalla, OR 97038

503-349-6892 cell

pioneer@bybryson.com

From: Jennifer Cline

Sent: Wednesday, July 22, 2015 10:51 AM

To: Craig Loughridge

Cc: Andrews Kelly

Subject: RE: Bridge Plans

Hi Craig,

Attached are comments for the path plans and structural bridge plans. Comments regarding the path are minor with exception to the orientation change for the north ADA dome pad.

There are also a few comments in regards to the footing depths and freeboard of the structure. Please address.

Please let me know if there are any questions.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676