From: Jennifer Cline

Sent: Tue May 05 14:10:19 2015

To: hai@curran-mcleod.com

Subject: RE: Over-ex/Dig-outs Measurements

Importance: Normal

Attachments: RE: Heintz Street - Digouts & paving;

 

Here’s the previous email from Curtis regarding cost. If you know the square footage for Heintz you can back out the cost per sq. ft.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: Hassan Ibrahim [mailto:hai@curran-mcleod.com]

Sent: Tuesday, May 05, 2015 1:03 PM

To: 'Jennifer Cline'

Subject: RE: Over-ex/Dig-outs Measurements

Will do when I see their quantities and how compatible are they with what you provided. I also need from EE the unit price per square yard to come up with the total cost. Please see below!

--------------------

Hassan Ibrahim, P.E.

CURRAN-McLEOD, INC.

6655 SW Hampton St, Ste. 210

Portland, OR 97223

Tel: 503-684-3478

Fax: 503-624-8247

Cell: 503-807-2737

email: hai@curran-mcleod.com

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Tuesday, May 05, 2015 12:50 PM

To: hai@curran-mcleod.com

Subject: RE: Over-ex/Dig-outs Measurements

Please provide the grinding in a separate change order.

The grinders removed the following:

Heintz St. – within the project limits shown on Sheets C10-C12, assuming the scale is 1” = 40’

· 2”- 6’ wide at edge of roadway (entire length, this a unit price item)

· 3” – Varies 24-25’ center of roadway (I will make 24.5’wide in my calculations)

· Center St intersection – 2” grind (needs to be measured) OKAY

Grange Ave. – within the project limits shown on Sheets C8-C10, assuming the scale is 1” = 60’

· 2”- 6’ wide at edge of roadway (entire length, this is a unit price item)

· 3” – Varies 30-31’wide center of roadway (I will make 30.5’ in my calculations)

Let me know what EE comes up with.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: Hassan Ibrahim [mailto:hai@curran-mcleod.com]

Sent: Tuesday, May 05, 2015 11:13 AM

To: 'Curtis Cooksey'; 'Jennifer Cline'

Subject: RE: Over-ex/Dig-outs Measurements

Hi Curtis,

I need to prepare a change order for some of the items that was done without a contract unit price, I need a list of those items that was agreed on by the City to include in one change order.

AC Grinding, manhole risers, etc…???

Thanks,

--------------------

Hassan Ibrahim, P.E.

CURRAN-McLEOD, INC.

6655 SW Hampton St, Ste. 210

Portland, OR 97223

Tel: 503-684-3478

Fax: 503-624-8247

Cell: 503-807-2737

email: hai@curran-mcleod.com

From: Curtis Cooksey [mailto:curtis@eagle-elsner.com]

Sent: Tuesday, May 05, 2015 10:42 AM

To: Jennifer Cline

Cc: hai@curran-mcleod.com

Subject: RE: Over-ex/Dig-outs Measurements

Hi Jennifer,

I’m sending you the locations and areas of the subgrade stabilization.

Let me know if you have any questions.

Curtis

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Tuesday, April 28, 2015 9:23 AM

To: Curtis Cooksey

Cc: Hassan Ibrahim; Dan Huff

Subject: Over-ex/Dig-outs Measurements

Hi Curtis,

We have had several dig-outs on this project for subgrade stabilization as you are aware. I would like to verify Barbs notes/spreadsheet to confirm measurement areas for payment. I’m assuming the measurements were also done for the few dig-outs on Grange and Heintz as well by Walter?

Thank you,

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676