From: Jennifer Cline

Sent: Fri Jun 26 11:48:26 2015

To: COLE David

Cc: Jason Clifford; Christine Hein; PINNEY Mike

Subject: RE: Molalla pH monitoring data

Importance: Normal

Attachments: US_4.1_pHix_ sensor.pdf; pH and temp.pdf;

 

Hi David,

Here is the additional information you requested, including our updated drawings.

We will take into consideration your advice below as well.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: COLE David [mailto:COLE.David@deq.state.or.us]

Sent: Friday, June 26, 2015 11:00 AM

To: 'Jennifer Cline'

Cc: Jason Clifford; Christine Hein; PINNEY Mike; COLE David

Subject: RE: Molalla pH monitoring data

Hello Jennifer. Thank you for sending me the user manual for your pHix compact pH & Redox transmitter.

Regarding the transmitter equipment itself, I have the following question and recommendation:

· Which electrode(s) did you get (refer to the user manual, p. 7)?

· Regarding maintenance/calibration, pay particular attention to the user manual maintenance section, p. 21. You may find that to get consistent, accurate results, you may have to calibrate more frequently than once a week, due to the low quality nature of the influent.

Regarding the transmitter location, please send me a sketch map of where specifically at the headworks, you intend to mount it. I would prefer both plan and elevation views of the mounting location. Also, describe the mounting method (refer to user manual, pp. 10 – 12).

Thank you.

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Friday, June 26, 2015 10:32 AM

To: COLE David

Cc: Jason Clifford; Christine Hein; PINNEY Mike

Subject: RE: Molalla pH monitoring data

Hi David,

This attached manual should provide all the information you are looking for. Pages 16-22 specifically address the Buffer adjustment, cleaning and maintenance.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: COLE David [mailto:COLE.David@deq.state.or.us]

Sent: Friday, June 26, 2015 9:10 AM

To: 'Jennifer Cline'

Cc: Jason Clifford; 'Christine Hein'; COLE David; PINNEY Mike

Subject: RE: Molalla pH monitoring data

Hello Jennifer. Thanks for the data table and comparison graph.

Please give me a schematic and/or verbal description of exactly where and how you plan to install the pH meter at the headworks. What is the make and model of the instrument? Also, what are the manufacturer’s recommendations regarding calibration frequency when the meter is used for continuous measurements? Thank you.

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Friday, June 26, 2015 8:59 AM

To: COLE David

Cc: Jason Clifford; 'Christine Hein'

Subject: Molalla pH monitoring data

Hi David,

The City will be moving forward with the permanent installation of the pH probe at the Headworks for continuous monitoring. As you can see in the attached .pdf the pH meter values are tracking very close to the grab sample pH value. If you have any comment or questions before we move forward with the permanent installation, please let me know.