Hi Sean,

 

Attached is the plan sheet for the Pond Inlet & Outlet structures detailing the valve design. I do not think there is a stem valve as shown for the butterfly valve out let pipe to Pond #2. I will also send some recent photos I’ve taken. Between the photos and plan sheet you can roughly calculate that the magic number is 8-ft for Lagoon #1 to prevent water over the spillway. We are currently at 10.1’ in Lagoon #1.

 

I have the full set of plans, with additional details on the lagoons (some are below) that I’m sure will be helpful with your investigations. Keep in mind there have been some changes to the system with the 2007 upgrades. This file is quite large. Do you happen to have a share file or ftp site I can share the file through?

 

Jennifer Cline, P.E. | Public Works Director

 

Licensed in OR, WA

 

City of Molalla

 

117 N Molalla Ave. | PO Box 248 * |Molalla, OR  97038

 

O: 503.759.0218 | F:  503.829.3676

 

 

_____________________________________________
From: Jennifer Cline [mailto:jcline@cityofmolalla.com]
Sent: Monday, January 11, 2016 9:29 AM
To: dhuff@cityofmolalla.com; Jason Clifford (jclifford@cityofmolalla.com) <jclifford@cityofmolalla.com>; SRagain@Geosyntec.com; Lisa Smith (LSmith@Geosyntec.com) <LSmith@Geosyntec.com>
Cc: Gerald Fisher <geraldf@pdgnw.com>; Mark Strandberg <MStrandberg@ringbenderlaw.com>; J.W. Ring <JWRing@ringbenderlaw.com>
Subject: RE: Molalla DEQ Pre-meeting

 

 

Hi Sean,

 

Attached is the plan sheet for the Pond Inlet & Outlet structures detailing the valve design. I do not think there is a stem valve as shown for the butterfly valve out let pipe to Pond #2. I have also included some recent photos I’ve taken. Between the photos and plan sheet you can roughly calculate that the magic number is 8-ft for Lagoon #1 to prevent water over the spillway. We are currently at 10.1’ in Lagoon #1.

 

I have the full set of plans, with additional details on the lagoons (some are below) that I’m sure will be helpful with your investigations. Keep in mind there have been some changes to the system with the 2007 upgrades. This file is quite large. Do you happen to have a share file or ftp site I can share the file through?

 

<< File: sewer_plant0011.pdf >> << File: sewer_plant0002.pdf >> << File: sewer_plant0009.pdf >> << File: sewer_plant0010.pdf >> << File: IMG_3983.jpg >> << File: IMG_3982.jpg >> << File: IMG_3980.jpg >> << File: IMG_3977.jpg >>

Thanks,

 

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR  97038

O: 503.759.0218 | F:  503.829.3676

 

 

-----Original Appointment-----
From: Mark Strandberg [mailto:MStrandberg@ringbenderlaw.com]
Sent: Friday, January 08, 2016 3:33 PM
To: J.W. Ring; jcline@cityofmolalla.com; dhuff@cityofmolalla.com; Jason Clifford (jclifford@cityofmolalla.com); SRagain@Geosyntec.com; Lisa Smith (LSmith@Geosyntec.com)
Subject: Molalla DEQ Pre-meeting
When: Monday, January 11, 2016 8:00 AM-9:00 AM (UTC-08:00) Pacific Time (US & Canada).
Where: 877-699-4804 Passcode 516097

 

 

877-699-4804  Passcode 516097