From: Jennifer Cline
Sent: Fri Aug 14 12:00:41 2015
To: Dan Zinder
Subject: Re: Linear feet by line size
Importance: Normal
Thanks,
Are you able to calculate the LF for each basin as listed in the schedule?
JC
Sent from my iPhone
On Aug 14, 2015, at 10:48 AM, Dan Zinder <dzinder@cityofmolalla.com> wrote:
The issue was with the 12 in. I missed a pipe in my summary stats. These numbers get you there.
Total
| 158079.7
|
4 in
| 1352.25
|
6 in
| 7640.65
|
8 in
| 112945.5
|
10 in
| 8544.05
|
12 in
| 12709.12
|
15 in
| 14149.79
|
18 in
| 738.39 |
Dan Zinder
503.759.0226
503.586.8094 (c)
From: Jennifer Cline [mailto:jcline@cityofmolalla.com]
Sent: Friday, August 14, 2015 10:41 AM
To: Dan Zinder <dzinder@cityofmolalla.com>
Subject: RE: Linear feet by line size
Even rounding the pipe length to whole numbers, I don’t add up to 158,080. Let me know where to make adjustments.
I’m coming up with 158,043 LF
Jennifer Cline, P.E. | Public Works Director
Licensed in OR, WA
117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038
O: 503.759.0218 | F: 503.829.3676
From: Dan Zinder [mailto:dzinder@cityofmolalla.com]
Sent: Wednesday, August 12, 2015 4:05 PM
To: Jennifer Cline <jcline@cityofmolalla.com>
Subject: Linear feet by line size
Voila. I’ll get you the maps shortly.
Total
| 158079.7
|
4 in
| 1352.25
|
6 in
| 7640.65
|
8 in
| 112945.5
|
10 in
| 8544.05
|
12 in
| 12672.1
|
15 in
| 14149.79
|
18 in
| 738.39 |
FYI – Sewer line materials aren’t identified in the old maps. Roy was assuming concrete but some may be AC. Perhaps that’s something the camera crew could help with since they’ll be looking up the lines?
- - - - - - - - -