From: Jennifer Cline
Sent: Mon Nov 02 15:00:01 2015
To: Daphne Marcyan; Sharar, Darlene K.; Chris Link
Cc: Hash, Kenneth F.
Subject: RE: Light/awning Conflict on S. Molalla
Importance: Normal
Itβs pole D12, 13+39 (23.50β Rt)
Jennifer Cline, P.E. | Public Works Director
Licensed in OR, WA
117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038
O: 503.759.0218 | F: 503.829.3676
From: Daphne Marcyan [mailto:Daphne.Marcyan@msa-ep.com]
Sent: Monday, November 02, 2015 2:56 PM
To: Sharar, Darlene K. <ShararD@hdjdg.com>; Chris Link <Chris.Link@msa-ep.com>
Cc: Hash, Kenneth F. <HashK@hdjdg.com>; Jennifer Cline <jcline@cityofmolalla.com>
Subject: RE: Light/awning Conflict on S. Molalla
Darlene,
Do you know the approximate road stationing where the luminaire is in conflict with the awning?
Thanks,
Daphne Marcyan, P.E. | Civil Engineer
Licensed in OR, WA
T: 503.225.9010 | Daphne.Marcyan@msa-ep.com
121 SW Salmon, Suite 900 | Portland, Oregon 97204-2919 | www.msa-ep.com
Murray, Smith & Associates, Inc. | Your Public Works Partner
Notice: This e-mail and any attached files are the private confidential property of the sender, and the materials are privileged communications intended solely for the receipt, use, benefit and information of the intended recipient indicated above. If you are not the intended recipient, you are hereby notified that any review, disclosure, copying, distribution, or taking of any other action in reliance on the contents of this transmission is strictly prohibited, and may result in legal liability on your part. If you have received this e-mail in error, please notify us immediately at the above address.
P Please consider the environment before printing this e-mail.
From: Sharar, Darlene K. [mailto:ShararD@hdjdg.com]
Sent: Monday, November 02, 2015 2:47 PM
To: Daphne Marcyan <Daphne.Marcyan@msa-ep.com>; Chris Link <Chris.Link@msa-ep.com>
Cc: Hash, Kenneth F. <HashK@hdjdg.com>; Jennifer Cline <jcline@cityofmolalla.com>
Subject: Light/awning Conflict on S. Molalla
Good afternoon β
Jennifer shared that there is now a conflict on the east side of S Molalla Avenue. An abutting property has replaced an awning just south of the resource center building.
Is it possible to relocate the luminaire approximately 10β to the north by the existing water service?
Thank you.
Darlene K. Sharar | Engineering Technician
HDJ DESIGN GROUP, PLLC
Engineers | Landscape Architects | Planners | Surveyors
314 W. 15th Street, Vancouver, WA 98660
Phone: 360/695-3488 Fax: 360/695-8767
DISCLAIMER: This electronic message and any attachments are supplied in good faith and are believed to be virus free. HDJ Design Group, PLLC accepts no responsibility for the damage or loss (arising from negligence or otherwise) which may occur through the use or transmission of this message and attachments.
The contents of this electronic message and any attachments are intended only for the addressee and may contain privileged or confidential information. If you are not the addressee, you are notified that any transmission, distribution, downloading, printing or photocopying of the contents of this message or attachments is strictly prohibited. The privilege of confidentiality attached to this message and any attachments is not waived, lost or destroyed by reason of mistaken delivery to you. If you receive this message in error, please notify the sender by return email or telephone by calling (360) 695-3488.