From: Jennifer Cline
Sent: Mon Mar 28 15:10:47 2016
To: Gerald Fisher
Subject: RE: Leak Test Prep Info
Importance: Normal
Is this necessary for the leak test results?
Jennifer Cline, P.E. | Public Works Director
Licensed in OR, WA
117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038
O: 503.759.0218 | F: 503.829.3676
From: Gerald Fisher [mailto:geraldf@pdgnw.com]
Sent: Monday, March 28, 2016 2:01 PM
To: Jennifer Cline <jcline@cityofmolalla.com>
Subject: RE: Leak Test Prep Info
Hi Jen,
The easiest way to do this is to have a one man survey go out and shoot the boundary. Otherwise, it will have to be an approximate surface area based on the design. We didn’t have this in our original scope but can do which ever one you want. Let me know which way you want to go. Accuracy costs more than the estimate based on the design.
Regards,
Gerald Fisher, PE | Senior Project Manager
PROJECT DELIVERY GROUP, LLC | 3150 22nd Street SE; Salem, OR 97302
www.PDGNW.com | 503-364-4004 (O) | 503-679-9237 (C)
** CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.
From: S Major [mailto:smajor@dyerpart.com]
Sent: Monday, March 28, 2016 12:07 PM
To: Jennifer Cline <jcline@cityofmolalla.com>
Cc: R Quigley <rquigley@dyerpart.com>; Gerald Fisher <geraldf@pdgnw.com>
Subject: RE: Leak Test Prep Info
Jennifer,
Thanks for the update. The operating level of 9 feet will allow PDG to calculate the water surface area. The backwash flow meter is the more important of the two. We will want to include any backwash flow with influent flow. The gauge that cannot be replaced is a concern. We will come up with a different option for measurement and can discuss at our April meeting.
Steve
From: Jennifer Cline [mailto:jcline@cityofmolalla.com]
Sent: Friday, March 25, 2016 12:44 PM
To: S Major
Cc: 'Gerald Fisher'; Jason Clifford; R Quigley
Subject: Leak Test Prep Info
Hi Steve,
I was looking through my notes and realized I own you some information on preparing for the trial run of the leak test.
· After discussing with Jason, at this time the optimum operation level of the lagoons is 9-ft. This allows plenty of room and maintain temperatures to allow for the ponds to break down the solids, yet provide adequate free board for safe operation levels.
· The flow meters at the headworks, DAF #1 and DAF #2 have been verified. We are waiting to receive the reports from the company.
· The flow meters for the gravity filter and back wash pump are having issues and a field service tech will be out to look at them both on Tuesday to determine if they can be repaired or need replaced. I wasn’t sure if these two were needed for the Leak Test or not.
· The flow meter at the DMS (discharge) will be verified after the shutdown beginning May 1st.
· We will need to look at options if we want to replace the staff gauge for Lagoon #2. The current gauge is measured on an incline an doesn’t allow for it to be replaced. If the existing gauge is insufficient for the test, we can look at alternate options.
Once I receive the verification reports, I will send them your way. Please let me know if left anything out or you need anything else.
Have a good weekend!
Jennifer Cline, P.E. | Public Works Director
Licensed in OR, WA
117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038
O: 503.759.0218 | F: 503.829.3676
No virus found in this message.
Checked by AVG - www.avg.com
Version: 2015.0.6189 / Virus Database: 4540/11785 - Release Date: 03/09/16
Internal Virus Database is out of date.