From: Jennifer Cline

Sent: Fri Feb 12 14:01:32 2016

To: BROOKS Kelly S; MILLER Theodore C; WATANABE Richard F

Cc: Dan Huff

Subject: RE: Follow Up for Molalla JT Discussion

Importance: Normal

 

Hi Ted,

I’m looking for design specific details for the 1R paver. Will this be an grind and inlay or overlay for additional structure? Will there be pavement repair included to correct existing subgrade failure areas? I’m guessing all non-conforming ADA ramps will also be retrofitted to meet current design standards?

Hi Rich,

In regards to STIP enhanced project, I’m looking for the scope in regards to the structure and storm drainage specifically. Will this be a total bridge replacement with a bottomless culvert or box culvert or just a cantilever add-on to the existing structure? Will closed drainage and ½ street improvements be added?

Regards,

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

From: BROOKS Kelly S [mailto:Kelly.BROOKS@odot.state.or.us]

Sent: Friday, February 12, 2016 1:16 PM

To: MILLER Theodore C <Theodore.C.MILLER@odot.state.or.us>; WATANABE Richard F <Richard.F.WATANABE@odot.state.or.us>

Cc: Dan Huff <dhuff@cityofmolalla.com>; 'Jennifer Cline' <jcline@cityofmolalla.com>

Subject: Follow Up for Molalla JT Discussion

Ted and Rich,

Dan and Jennifer asked me a couple questions about the paving project and current Enhance projects that I couldn’t answer on our phone call the other day. Ted can you respond with ab it more information the proposed preservation project? Specifically will the project be repairing the roadway where the base as hailed. Rich, can you respond back with the current scope of work for the Enhance project as it pertains to the box culvert at Bear Creek?

 

Thanks,

Kelly Scannell Brooks

Interim Policy and Development Manager

ODOT Region 1

(503) 731-3087