From: Jennifer Cline
Sent: Mon Feb 23 08:01:04 2015
To: sharard@hdjdg.com
Cc: Dan Zinder
Subject: RE: City water, sanitary and storm sewer system plans
Importance: Normal
Hi Darlene,
Looks like Dan Zinder is out sick today, so I’m sure he will get those as-builts to you on Tuesday instead.
Jennifer Cline, P.E.
City of Molalla
Public Works Director
O: 503.759.0218
F: 503.829.3676
From: Dan Zinder [mailto:dzinder@cityofmolalla.com]
Sent: Thursday, February 19, 2015 5:34 PM
To: Jennifer Cline
Cc: sharard@hdjdg.com
Subject: RE: City water, sanitary and storm sewer system plans
Greetings Darlene,
I’ve attached KML files for our sewer, water, and storm systems viewable in Google Earth. These are exports from our developing GIS database. Field collection is complete as follows for the site areas:
Sewer collection is complete except for manholes/mains along Highway 211. Uncollected areas are approximated.
Water has not been collected along Highway 211 and some of Molalla Ave. Uncollected areas are approximated.
Storm has not yet been collected on Molalla Ave and uncollected areas are not approximated.
I’m out tomorrow but let’s touch base early Monday by phone to coordinate additional data transfer. Also – it would be helpful if you could send along a way (ftp site link, etc) to transfer some of the resultant larger files to you.
Thanks,
Dan Zinder
503.759.0226
503.586.8094 (c)
From: Jennifer Cline [mailto:jcline@cityofmolalla.com]
Sent: Thursday, February 19, 2015 4:44 PM
To: Dan Zinder
Subject: FW: City water, sanitary and storm sewer system plans
Hi Dan,
Can you please send Darlene the Google Earth link of our utilities and any as-builts you can find for the attached Urban Renewal Project locations?
I recently sent her the proposed plans for Metzler water line from Hassan on should be built. Let me know if you have any questions. I will be in tomorrow until noonish.
Thanks!
Jennifer Cline, P.E.
City of Molalla
Public Works Director
O: 503.759.0218
F: 503.829.3676
From: Sharar, Darlene K. [mailto:ShararD@hdjdg.com]
Sent: Tuesday, February 17, 2015 12:55 PM
Subject: City water, sanitary and storm sewer system plans
Hello Ms. Cline –
I am supporting Ken Hash on your city streets project on the utility coordination effort.
Would it be possible to obtain the city water, sanitary and sewer system plans in the vicinity of the streets that are to be upgraded or built? Does the City have any expansion plans in the area that we should be taking into consideration during the design phase?
Thank you for your assistance.
Darlene K. Sharar | Construction Management
HDJ DESIGN GROUP, PLLC
Engineers | Landscape Architects | Planners | Surveyors
314 W. 15th Street, Vancouver, WA 98660
Phone: 360/695-3488 Fax: 360/695-8767
DISCLAIMER: This electronic message and any attachments are supplied in good faith and are believed to be virus free. HDJ Design Group, PLLC accepts no responsibility for the damage or loss (arising from negligence or otherwise) which may occur through the use or transmission of this message and attachments.
The contents of this electronic message and any attachments are intended only for the addressee and may contain privileged or confidential information. If you are not the addressee, you are notified that any transmission, distribution, downloading, printing or photocopying of the contents of this message or attachments is strictly prohibited. The privilege of confidentiality attached to this message and any attachments is not waived, lost or destroyed by reason of mistaken delivery to you. If you receive this message in error, please notify the sender by return email or telephone by calling (360) 695-3488.