There are items not included below that are a part of the current CIP list.

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

From: Dan Huff [mailto:dhuff@cityofmolalla.com]

Sent: Wednesday, February 03, 2016 1:53 PM

To: Ryan Hepler <rhepler@cityofmolalla.com>; Jennifer Cline <jcline@cityofmolalla.com>

Subject: RE: CIP

Thanks Ryan

From: Ryan Hepler [mailto:rhepler@cityofmolalla.com]

Sent: Wednesday, February 03, 2016 1:19 PM

To: Jennifer Cline <jcline@cityofmolalla.com>

Cc: Dan Huff <dhuff@cityofmolalla.com>

Subject: RE: CIP

Here are some projects to be done in 2016-2017.

1. Filter #1 media removal and replacement. The estimated cost was approximately $45,000.

2. Replace obsolete chemical feed pumps and related equipment for Filter #3 and #4. Cost est. $15,000.

3. Install a Streamflow Gauging Station at Trout Creek and move forward with transferring the water right from Trout Creek to the Molalla River.

4. Upgrade the Pipe Gallery for the Old Plant (filter #3 and #4). This would include replacing the control valves, effluent pumps, surface wash pump, replace or rebuild backwash pump, repair or replace effluent piping that has been corroded by the chlorine injection port, and include a filter-to-waste pipe, valves and controls.

5. We need to look into groundwater options. Explore the possibility of drilling a well down near the pump station or inside the City.

6. Repair or replace our Alternate Intake. The “Vern Valve” piping is not giving us the water output in the winter when needed. We use this when the river has very high turbidity (usually 5-6 times in the Fall and Winter) or when our intake screens are plugged our otherwise inoperable.

Ryan Hepler

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Wednesday, February 03, 2016 12:47 PM

To: 'Ryan Hepler' <rhepler@cityofmolalla.com>

Subject: CIP

Hi Ryan,

As we talked be for, just send me a list in regards to projects you and I have discussed previously. For example, the media replacement (both tanks), pipe gallery Filters #? And so on.