From: Jennifer Cline

Sent: Mon May 16 16:19:09 2016

To: Peggy Johnson

Subject: RE: Check/Diamond Cutting

Importance: Normal

 

TY ā€“ I will let Adam know.

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

From: Peggy Johnson [mailto:pjohnson@cityofmolalla.com]

Sent: Monday, May 16, 2016 3:36 PM

To: Jennifer Cline <jcline@cityofmolalla.com>; Marc McKee <Marc@kodiakco.com>

Cc: Adam Shultz <ashultz@cityofmolalla.com>; Hash, Kenneth F. <HashK@hdjdg.com>; Dennis Welle <dwelle@cityofmolalla.com>; Buehler, John A. <BuehlerJ@hdjdg.com>

Subject: RE: Check/Diamond Cutting

Jenn,

We received the check today from Kodiak Pacific.

Peggy

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Thursday, May 12, 2016 9:29 AM

To: Marc McKee <Marc@kodiakco.com>

Cc: Peggy Johnson <pjohnson@cityofmolalla.com>; Adam Shultz <ashultz@cityofmolalla.com>; Hash, Kenneth F. <HashK@hdjdg.com>; Dennis Welle <dwelle@cityofmolalla.com>; Buehler, John A. <BuehlerJ@hdjdg.com>

Subject: RE: Check/Diamond Cutting

Hi Marc,

Thank you for the update. I will have Adam set the meter once we receive the check.

In regards to the diamond cut, since this project was built from ODOT standards, I will defer to their standards. Please see ODOT standard drawing, Manhole Frame Adjustment RD360 Method ā€œCā€, with the exception of #4 bars and PCC. The #4 bars and PCC may be eliminated and PCC replaced with AC.

Please Note: Install metal spacers with non-shrink grout and allow minimum 24 hour cure. Please provide submittal for the spacers and non-shrink grout.

Thanks,

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

From: Marc McKee [mailto:Marc@kodiakco.com]

Sent: Wednesday, May 11, 2016 5:20 PM

To: 'Jennifer Cline' <jcline@cityofmolalla.com>

Subject: Check/Diamond Cutting

The check for the meter will be mailed tomorrow.

Is there a specific size or parameter we are cut for the diamond cutting around the manholes?

Thank you,

Marc McKee

Kodiak Pacific Construction

C(503) 880-2035 O(503) 783-4305