From: Jennifer Cline
Sent: Thu May 12 09:28:37 2016
To: Marc McKee
Cc: Peggy Johnson; Adam Shultz; Hash, Kenneth F.; Dennis Welle; Buehler, John A.
Subject: RE: Check/Diamond Cutting
Importance: Normal
Hi Marc,
Thank you for the update. I will have Adam set the meter once we receive the check.
In regards to the diamond cut, since this project was built from ODOT standards, I will defer to their standards. Please see ODOT standard drawing, Manhole Frame Adjustment RD360 Method āCā, with the exception of #4 bars and PCC. The #4 bars and PCC may be eliminated and PCC replaced with AC.
Please Note: Install metal spacers with non-shrink grout and allow minimum 24 hour cure. Please provide submittal for the spacers and non-shrink grout.
Thanks,
Jennifer Cline, P.E. | Public Works Director
Licensed in OR, WA
117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038
O: 503.759.0218 | F: 503.829.3676
From: Marc McKee [mailto:Marc@kodiakco.com]
Sent: Wednesday, May 11, 2016 5:20 PM
To: 'Jennifer Cline' <jcline@cityofmolalla.com>
Subject: Check/Diamond Cutting
The check for the meter will be mailed tomorrow.
Is there a specific size or parameter we are cut for the diamond cutting around the manholes?
Thank you,
Marc McKee
Kodiak Pacific Construction
C(503) 880-2035 O(503) 783-4305