From: Jennifer Cline

Sent: Thu May 12 09:59:24 2016

To: Marc McKee

Cc: Peggy Johnson; Adam Shultz; Hash, Kenneth F.; Dennis Welle; Buehler, John A.

Subject: RE: Check/Diamond Cutting

Importance: Normal

 

As long as it has been 24 hours, yes.

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

From: Marc McKee [mailto:Marc@kodiakco.com]

Sent: Thursday, May 12, 2016 9:35 AM

To: 'Jennifer Cline' <jcline@cityofmolalla.com>

Cc: 'Peggy Johnson' <pjohnson@cityofmolalla.com>; 'Adam Shultz' <ashultz@cityofmolalla.com>; 'Hash, Kenneth F.' <HashK@hdjdg.com>; 'Dennis Welle' <dwelle@cityofmolalla.com>; 'Buehler, John A.' <BuehlerJ@hdjdg.com>

Subject: RE: Check/Diamond Cutting

If we use a rapid set grout, could we cut, adjust steel plate on the 17th and patch back the day we pave on the 18th?

Thank you,

Marc McKee

Kodiak Pacific Construction

C(503) 880-2035 O(503) 783-4305

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Thursday, May 12, 2016 9:29 AM

To: Marc McKee

Cc: Peggy Johnson; Adam Shultz; Hash, Kenneth F.; Dennis Welle; Buehler, John A.

Subject: RE: Check/Diamond Cutting

Hi Marc,

Thank you for the update. I will have Adam set the meter once we receive the check.

In regards to the diamond cut, since this project was built from ODOT standards, I will defer to their standards. Please see ODOT standard drawing, Manhole Frame Adjustment RD360 Method ā€œCā€, with the exception of #4 bars and PCC. The #4 bars and PCC may be eliminated and PCC replaced with AC.

Please Note: Install metal spacers with non-shrink grout and allow minimum 24 hour cure. Please provide submittal for the spacers and non-shrink grout.

Thanks,

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

From: Marc McKee [mailto:Marc@kodiakco.com]

Sent: Wednesday, May 11, 2016 5:20 PM

To: 'Jennifer Cline' <jcline@cityofmolalla.com>

Subject: Check/Diamond Cutting

The check for the meter will be mailed tomorrow.

Is there a specific size or parameter we are cut for the diamond cutting around the manholes?

Thank you,

Marc McKee

Kodiak Pacific Construction

C(503) 880-2035 O(503) 783-4305