From: Jennifer Cline
Sent: Mon May 02 14:49:15 2016
To: Alan McCall
Cc: Gerald Fisher; Nicolas Lennartz
Subject: RE: Catch Basin Question
Importance: Normal
Hi Alan,
An storm system in line with the catch basins is not a standard design for the City of Molalla. What project is this in reference to? This may be something you propose with your design that the City can approve.
Regards,
Jennifer Cline, P.E. | Public Works Director
Licensed in OR, WA
117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038
O: 503.759.0218 | F: 503.829.3676
From: Alan McCall [mailto:amccall@cesnw.com]
Sent: Monday, May 02, 2016 2:38 PM
To: jcline@cityofmolalla.com
Subject: Catch Basin Question
Hi Jennifer,
I was not able to find any information regarding if a catch basin line can be stubbed directly into the mainline without a manhole. Is this allowed in the City?
Thank you,
Alan McCall, EIT, LSIT
CES|NW, Inc.
13190 SW 68th Parkway, Suite 150
Tigard, OR 97223
Office: 503 – 968 – 6655