From: Jennifer Cline

Sent: Fri Oct 17 09:31:29 2014

To: Greg Blaylock

Cc: William Peterson; Morgan Will; Scott Hewett; Scott Peterson; Stew Cleave; hai@curran-mcleod.com; Garrett Edmunds; Nicolas Lennartz

Subject: RE: Big Meadwo 15 Storm Drain Area Drain

Importance: Normal

 

Approved.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.829.6855 Ext. #218

F: 503.829.3676

image "file:///C:

From: Greg Blaylock [mailto:blaylock@wip2010.com]

Sent: Friday, October 17, 2014 9:29 AM

To: 'Jennifer Cline'

Cc: 'William Peterson'; 'Morgan Will'; 'Scott Hewett'; 'Scott Peterson'; 'Stew Cleave'; hai@curran-mcleod.com; 'Garrett Edmunds'; 'Nicolas Lennartz'

Subject: RE: Big Meadwo 15 Storm Drain Area Drain

Jennifer,

I’ve added a note to the detail indicating the separation that needs to be maintained and have attached it to this email. Can we assume that this is acceptable and proceed with the construction of the private storm drain? Thanks again for your quick response to these issues.

Regards,

Greg Blaylock

Engineering Technician

Peterson Engineering Consultants Inc.

4300 Cherry Ave. NE

Keizer, OR 97303

Phone: 503-390-7402

Fax: 503-390-7461

Cell: 503-508-2618

blaylock@wip2010.com

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Friday, October 17, 2014 8:49 AM

To: Greg Blaylock

Cc: William Peterson; Morgan Will; Scott Hewett; Scott Peterson; Stew Cleave; hai@curran-mcleod.com; Garrett Edmunds; Nicolas Lennartz

Subject: RE: Big Meadwo 15 Storm Drain Area Drain

Hi Greg,

I do not have a problem with this change or adding the private drain to our system. However, please show you have a 12” min separation between the drain pipe and gas line per NW Naturals standards.

https://www.nwnatural.com/uploadedFiles/Business/Partners/BuilderServices/TrenchSpecification/Trench_Specifications.pdf

In addition, please ensure the minor changes and any grade changes are included on the as-builts. I have had some recent concerns from home owners that grade elevations adjacent to their fence lines are higher than the their property elevation and have concerns this is going to create a drainage issue onto their property. I will be reviewing site next week for any possible non-point source drainage concerns.

Regards,

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759-0218

F: 503.829.3676

image "file:///C:

From: Greg Blaylock [mailto:blaylock@wip2010.com]

Sent: Thursday, October 16, 2014 11:08 AM

To: Jennifer Cline

Cc: 'William Peterson'; 'Morgan Will'; 'Scott Hewett'; 'Scott Peterson'; 'Stew Cleave'

Subject: Big Meadwo 15 Storm Drain Area Drain

Jennifer,

Attached, for you approval, please find a drawing of our proposed connection for the private storm drain area drain to the public catch basin located at Sta. 5+68.24 on Julie Lane. Please reply to all, to expedite execution of this minor change.

Regards,

Greg Blaylock

Engineering Technician

Peterson Engineering Consultants Inc.

4300 Cherry Ave. NE

Keizer, OR 97303

Phone: 503-390-7402

Fax: 503-390-7461

Cell: 503-508-2618

blaylock@wip2010.com