From: Jennifer Cline
Sent: Fri Oct 17 08:49:40 2014
To: Greg Blaylock
Cc: William Peterson; Morgan Will; Scott Hewett; Scott Peterson; Stew Cleave; hai@curran-mcleod.com; Garrett Edmunds; Nicolas Lennartz
Subject: RE: Big Meadwo 15 Storm Drain Area Drain
Importance: Normal
Hi Greg,
I do not have a problem with this change or adding the private drain to our system. However, please show you have a 12” min separation between the drain pipe and gas line per NW Naturals standards.
In addition, please ensure the minor changes and any grade changes are included on the as-builts. I have had some recent concerns from home owners that grade elevations adjacent to their fence lines are higher than the their property elevation and have concerns this is going to create a drainage issue onto their property. I will be reviewing site next week for any possible non-point source drainage concerns.
Regards,
Jennifer Cline, P.E.
City of Molalla
Public Works Director
O: 503.759-0218
F: 503.829.3676
From: Greg Blaylock [mailto:blaylock@wip2010.com]
Sent: Thursday, October 16, 2014 11:08 AM
To: Jennifer Cline
Cc: 'William Peterson'; 'Morgan Will'; 'Scott Hewett'; 'Scott Peterson'; 'Stew Cleave'
Subject: Big Meadwo 15 Storm Drain Area Drain
Jennifer,
Attached, for you approval, please find a drawing of our proposed connection for the private storm drain area drain to the public catch basin located at Sta. 5+68.24 on Julie Lane. Please reply to all, to expedite execution of this minor change.
Regards,
Greg Blaylock
Engineering Technician
Peterson Engineering Consultants Inc.
4300 Cherry Ave. NE
Keizer, OR 97303
Phone: 503-390-7402
Fax: 503-390-7461
Cell: 503-508-2618