From: Jennifer Cline

Sent: Mon Mar 23 12:21:22 2015

To: hai@curran-mcleod.com

Cc: Curtis Cooksey; Dennis Welle; ashultz@cityofmolalla.com

Subject: RE: Analytical Report

Importance: Normal

 

I spoke with Bob this morning. The City will be on site to pot hole the location this week after the work is complete tomorrow by EE.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: Hassan Ibrahim [mailto:hai@curran-mcleod.com]

Sent: Monday, March 23, 2015 7:12 AM

To: jcline@cityofmolalla.com

Cc: 'Curtis Cooksey'

Subject: RE: Analytical Report

Hi Jenn,

As per our field meeting on Friday and as discussed with Dick of Eagle-Elsner we recommend removing the AC Flanged adaptor and replacing it with FLxMJ gate valve and make the connection as shown on detail “F” sheet c13.

If the City wishes to install an 8” valve on the south leg of the waterline, the contractor suggested the City pothole and determine the depth of the water line as it appears to be diving below the existing 36” CMP culvert so it can be determined where is the best place to install the valve.

Please let us know your thoughts.

--------------------

Hassan Ibrahim, P.E.

CURRAN-McLEOD, INC.

6655 SW Hampton St, Ste. 210

Portland, OR 97223

Tel: 503-684-3478

Fax: 503-624-8247

Cell: 503-807-2737

email: hai@curran-mcleod.com