From: Jennifer Cline

Sent: Fri Apr 17 08:53:52 2015

To: hai@curran-mcleod.com

Cc: Curtis Cooksey

Subject: RE: Additional C.O requests

Importance: Normal

 

Nope 7th st on the NW corner does not have catch basin currently

 

The catch basin at the NE corner on 6th street had a concrete encased stove pipe to the main. We had them remove the pipe from the new basin to the main. I don’t know the exact size of pipe put back. Weather it was 6", 8" or 10"???

 

Hope that clears everything up.

 

 

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

 

 

-----Original Message-----

From: Hassan Ibrahim [mailto:hai@curran-mcleod.com]

Sent: Friday, April 17, 2015 8:30 AM

To: 'Jennifer Cline'

Subject: RE: Additional C.O requests

 

We are talking 6th St.

 

--------------------

Hassan Ibrahim, P.E.

CURRAN-McLEOD, INC.

6655 SW Hampton St, Ste. 210

Portland, OR 97223

Tel: 503-684-3478

Fax: 503-624-8247

Cell: 503-807-2737

email: hai@curran-mcleod.com

 

 

-----Original Message-----

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Friday, April 17, 2015 8:15 AM

To: <hai@curran-mcleod.com>

Subject: Re: Additional C.O requests

 

There is no catch basin on the NW corner of Stowers and 7th currently. I will send a sketch this morning.

 

Sent from my iPhone

 

> On Apr 17, 2015, at 8:12 AM, Hassan Ibrahim <hai@curran-mcleod.com> wrote:

>

> I talked to Bo and we have a new catch basin in this corner, please

> send me a sketch to clarify what you need to be done?

>

> --------------------

> Hassan Ibrahim, P.E.

> CURRAN-McLEOD, INC.

> 6655 SW Hampton St, Ste. 210

> Portland, OR 97223

> Tel: 503-684-3478

> Fax: 503-624-8247

> Cell: 503-807-2737

> email: hai@curran-mcleod.com

>

> -----Original Message-----

> From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

> Sent: Friday, April 17, 2015 8:00 AM

> To: Hassan Ibrahim

> Subject: Re: Additional C.O requests

>

> I don't think the storm drain repair was 10". Please verify w Bob.

>

> Sent from my iPhone

>

>> On Apr 17, 2015, at 6:33 AM, Hassan Ibrahim <hai@curran-mcleod.com>

wrote:

>>

>> Hi Curtis,

>>

>>

>>

>> As per the City's request attached please find the location of the

>> proposed changes, also see below our responses in red.

>>

>>

>>

>> Should you have any questions, please let me know.

>>

>>

>>

>> Thanks,

>>

>> --------------------

>> Hassan Ibrahim, P.E.

>> CURRAN-McLEOD, INC.

>> 6655 SW Hampton St, Ste. 210

>> Portland, OR 97223

>> Tel: 503-684-3478

>> Fax: 503-624-8247

>> Cell: 503-807-2737

>> email: hai@curran-mcleod.com

>>

>>

>>

>> From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

>> Sent: Thursday, April 16, 2015 2:59 PM

>> To: Hassan Ibrahim

>> Cc: 'Curtis Cooksey'; Dan Huff; Heather Penni; Dennis Welle; 'Adam

Shultz'

>> Subject: Additional C.O requests

>>

>>

>>

>> Hi Hassan,

>>

>>

>>

>> The City would like to request a change order for the 3 additional items.

>>

>>

>>

>> . Storm drain pipe repair from the catch basin located at the NE

>> corner of 6th St and Stowers Ave. This can be paid under 10" DI Pipe

>> as per

>> CO#5 @$47.10/ LF. However, it can be included as a line item in a new

>> CO

> #7.

>>

>> . Construct a new storm Type G-2 Basin at the NW corner of 7th

and

>> Stowers and connecting it to the storm main in 7th St. There is

>> nowhere for the water flowing to the south to drain. The next

>> nearest storm basin is on 7th and Cole at least 100 yards away with

>> almost 0%

> slope in some areas.

>> This can be paid under 10" DI Pipe as per CO#5 @$47.10/ LF. However,

>> it can be included as a line item in a new CO #7.

>>

>> . Add a water valve at Heintz and Kennel for the south main on

>> Kennel. There currently is no ability to shut off the water south on

>> Kennel without turning off other users water as well. 1 existing

>> valve is to be abandoned as well. Need a price for this one.

>>

>> . Add 1 day to the schedule for determining the driveway

conflicts

>> on Stowers. I am thinking 2 days (one for the storm work and one for

>> the valve installation)

>>

>>

>>

>> Jennifer Cline, P.E.

>>

>> City of Molalla

>>

>> Public Works Director

>>

>> O: 503.759.0218

>>

>> F: 503.829.3676

>>

>>

>> <file:///C:\Users\jsherman\AppData\Roaming\Microsoft\Signatures\jenni

>> f

>> er%20c

>> line_files\Image001.jpg>

>>

>> <Stowers Changes.pdf>

>