From: Jennifer Cline

Sent: Fri Mar 25 14:28:53 2016

To: Mitch Jorgensen

Cc: Nicolas Lennartz; Dan Huff; Gerald Fisher

Subject: RE: [QUAR] RE: MRM Water Main extension

Importance: Normal

Attachments: image001.jpg; Comments.pdf; W-3040 Fire Hydrant.pdf; W-3020 Standard Valve Box & Lid.pdf; W-3000 Horizontal Thrust Blocks.pdf;

 

Hi Mitch,

Here are few items that will need to be addressed prior to construction:

· Once you receive the plans from your engineer, we can review them for final approval.  I have included the new City Standard drawings that will need to be incorporated with your plans for construction, Plans Note 2 in attachment.

·  And estimate of the public improvement costs provided from your engineer, General Note 3 in attachment.

· Provide documentation of approval from OHA review

· Pay design review fee and construction permit/inspection fees

· The fees must be paid to the City prior to issuing a construction permit

An OHA review is not needed to move the hydrant.  This fire hydrant extension line is not servicing a potable water system.  However, you will be required to have the City inspect the line and follow state requirements for disinfection.

Please let me know if you have any questions,

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR  97038

O: 503.759.0218 | F:  503.829.3676

From: Mitch Jorgensen [mailto:mjj@molalla.net]

Sent: Friday, March 25, 2016 1:30 PM

To: 'Nicolas Lennartz' <nlennartz@cityofmolalla.com>

Cc: 'Jennifer Cline' <jcline@cityofmolalla.com>

Subject: RE: [QUAR] RE: MRM Water Main extension

OK thanks for getting back to me. I’m still waiting for my engineer to get the plans back to me with 8” designations. MJJ

From: Nicolas Lennartz [mailto:nlennartz@cityofmolalla.com]

Sent: Friday, March 25, 2016 11:27 AM

To: Mitch Jorgensen

Cc: Jennifer Cline

Subject: RE: [QUAR] RE: MRM Water Main extension

Hi Mitch,

 

I’ll fill out this LUCS no problem once we get engineering sign off, I think there’s a step or two Jennifer has to complete first, but it’s on my radar.

 

Thanks,

Nicolas Lennartz | Community Planner | City of Molalla

O: 503∙759∙0219 | C: 503∙998∙7048

communityplanner at cityofmolalla.com

117 N. Molalla Ave. | Molalla, OR 97038

image "file:///C:

From: Mitch Jorgensen [mailto:mjj@molalla.net]

Sent: Wednesday, March 23, 2016 1:55 PM

To: 'Nicolas Lennartz' <nlennartz@cityofmolalla.com>

Subject: [QUAR] RE: MRM Water Main extension

Here is their form. It’s pretty straight forward and simple. I’m assuming you choose option #2.

This waterline is being completed from when it was originally proposed, Nic. Just adding an additional fire hydrant and upsizing the line from 6” to 8” in accordance with Jen’s wishes when we spoke over a year ago about this. I will provide the plans, which are being corrected now, to you and Jen for your approval. Then I’ve spoke to the county. They say I need to get a permit, so I’ll do that, and they’ll inspect.

I would guess that you and Jen will want to see the plans before you sign the LUCS. MJJ

From: Nicolas Lennartz [mailto:nlennartz@cityofmolalla.com]

Sent: Wednesday, March 23, 2016 1:28 PM

To: Mitch Jorgensen

Subject: FW: MRM Water Main extension

Hi Mitch,

 

Just a heads up, the LUCS is usually a document that needs filling out, and is provided by the authority. It’ll usually have a list of questions that I need to answer and then sign saying that your development is up to standard.

 

If they have not provided you one, then either inquire or give them my contact information and I’ll see how I can help.

 

Thanks,

Nicolas Lennartz | Community Planner | City of Molalla

O: 503∙759∙0219 | C: 503∙998∙7048

communityplanner at cityofmolalla.com

117 N. Molalla Ave. | Molalla, OR 97038

image "file:///C:

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Wednesday, March 23, 2016 9:05 AM

To: Nicolas Lennartz <nlennartz@cityofmolalla.com>

Subject: FW: MRM Water Main extension

fyi

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

From: Mitch Jorgensen [mailto:mjj@molalla.net]

Sent: Tuesday, March 22, 2016 8:43 PM

To: 'Jennifer Cline' <jcline@cityofmolalla.com>

Subject: MRM Water Main extension

We are gearing up to submit this to you for approval. Need a signed LUCS to take with approved plans to O.H.A. Once I get the final plans we’ll have the MFD sign off too as per Hassan’s recommendation. I forwarded a copy of his comments so you don’t have to go digging for it. I’ll provide costs in 6” and 8” so costs are identifiable. Who needs to sign the LUCS, and do you have a blank boiler plate copy of one?

I want to get the plan submitted to move that fire hydrant near our new shop, but I don’t want to include it in this plan unless we have to. Are you going to make us get approval from O.H.A. to move it too? There’s no sewer line crossing, and we don’t anticipate a huge move with it. May alter the position slightly, and place on the other side of the existing water line.

Mitch Jorgensen, Pres.

image QCT/CCT #44362

Molalla Redi-Mix & Rock Products, Inc.

PO Box 555

Molalla, Or 97038

(503) 829-5555 x 15 office

(503) 829-5558 fax

(503) 969-3377 cell

mjj@molalla.net

Online at molallaredimix.com

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Thursday, November 06, 2014 12:25 PM

To: Mitch Jorgensen

Cc: Dan Huff; Garrett Edmunds; Dan Zinder

Subject: RE: MRM Water Main extension

Hi Mitch,

In order to do that the City will need a cost proposal for both 6” and 8” line sizes prior to construction. The cost difference will be refunded once the waterline install is complete and accepted by the City after inspection.

In addition, please insure all of Hassan’s comments have been met, including Garrett’s request for specifying PEX tubing for the service line. See attached email.

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.759.0218

F: 503.829.3676

image "file:///C:

From: Mitch Jorgensen [mailto:mjj@molalla.net]

Sent: Wednesday, October 15, 2014 5:36 PM

To: 'Jennifer Cline'

Cc: 'Dan Huff'; 'Garrett Edmunds'; 'Dan Zinder'

Subject: RE: MRM Water Main extension

Awesome; and not so awesome. This was approved as a 6” line to begin with. How about the City pick up the extra cost to go 8”?

From: Jennifer Cline [mailto:jcline@cityofmolalla.com]

Sent: Wednesday, October 15, 2014 5:02 PM

To: 'Mitch Jorgensen'

Cc: Dan Huff; Garrett Edmunds; Dan Zinder

Subject: MRM Water Main extension

Hi Mitch,

Good news, I was able to locate the full easement that was recorded with the county so we are “good to go” with the existing 15’ easement. Please make sure the easements in the attached docs are represented on the plans.

I also spoke with Hassan, since the water line will eventually be in full circulation line when the road is annexed, we require the line to be 8” pipe.

Regards,

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.829.6855 Ext. #218