Hi Mitch,

Good news, I was able to locate the full easement that was recorded with the county so we are “good to go” with the existing 15’ easement. Please make sure the easements in the attached docs are represented on the plans.

I also spoke with Hassan, since the water line will eventually be in full circulation line when the road is annexed, we require the line to be 8” pipe.

Regards,

Jennifer Cline, P.E.

City of Molalla

Public Works Director

O: 503.829.6855 Ext. #218

F: 503.829.3676