From: Jennifer Cline

Sent: Tue Dec 22 09:43:51 2015

To: 'Chris Link'

Cc: Hash, Kenneth F.

Subject: Molalla Ave. cross-section

Importance: Normal

 

Hi Chris,

I would like to see what the additional cost would be to build full depth (curb to curb) 200 ft on either side of the Main Street intersection, beginning at the proposed sawcut line.

Also, do we have something (note, standard or special) that says only to static roll the cement amended soil.

Thank you,

Jennifer Cline, P.E. | Public Works Director

Licensed in OR, WA

City of Molalla

117 N Molalla Ave. | PO Box 248 * |Molalla, OR 97038

O: 503.759.0218 | F: 503.829.3676

image